Eastland Electric, Inc.
69 permits across 21 towns in the last 6 months
Electrical
Business contact from Woonsocket OpenGov record (signed-in), checked Nov 13, 2026. Not from permit records.
Activity by month
Permits filed each month. The first and last months are partial.
Where they’re working
Permits filed under this contractor by state and town, last 6 months.
RI 69
Types of projects
By place, trade and period
| Town / city | State | Trade | Last 90 days | Last 6 months | All documented |
|---|---|---|---|---|---|
| Providence | RI | Electrical | 6 | 10 | 10 |
| Woonsocket | RI | Electrical | 3 | 7 | 7 |
| Burrillville | RI | Electrical | 3 | 7 | 7 |
| Cumberland | RI | Electrical | 5 | 6 | 7 |
| Pawtucket | RI | Electrical | 3 | 6 | 6 |
| Lincoln | RI | Electrical | 2 | 6 | 6 |
| East Providence | RI | Electrical | 5 | 5 | 5 |
| Cranston | RI | Electrical | 3 | 4 | 4 |
| Smithfield | RI | Electrical | 2 | 3 | 3 |
| Johnston | RI | Electrical | 1 | 2 | 2 |
| Warwick | RI | Electrical | 1 | 2 | 2 |
| Coventry | RI | Electrical | 1 | 2 | 2 |
| North Smithfield | RI | Electrical | 1 | 1 | 1 |
| North Kingstown | RI | Electrical | 1 | 1 | 1 |
| Westerly | RI | Electrical | 1 | 1 | 1 |
| South Kingstown | RI | Electrical | 0 | 1 | 1 |
| North Providence | RI | Electrical | 0 | 1 | 1 |
| Foster | RI | Electrical | 0 | 1 | 1 |
| Newport | RI | Electrical | 0 | 1 | 1 |
| Scituate | RI | Electrical | 0 | 1 | 1 |
| Central Falls | RI | Electrical | 0 | 1 | 1 |
Permit timeline
- Nov 6, 2026Install 18kw standby generator. All manufacture clearances to be met.East Providence · Electrical · Electrical · -1 · #E-26-876
- Nov 6, 2026Install standby generator at right rear of home. All manufacture clearances to be met.Cumberland · Electrical · Electrical · 1 · #EP-26-554
- Nov 6, 2026Replace 200A ServiceCumberland · Electrical · Electrical · 1 · #EP-26-553
- Nov 6, 2026Install standby generator. All manufacture clearances to be met.North Smithfield · Electrical · Electrical · 1 · #E-26-225
- Nov 5, 2026Inspect service due to utility disconnecting power and requiring electrical inspection to have power reinstated. No workProvidence · Electrical · Electrical · 1 · #ELEC-26-2083
- Nov 5, 2026Inspect service due to utility disconnecting power and requiring electrical inspection to have power reinstated. No workPawtucket · Electrical · Electrical · 1 · #ELEC-26-660
- Nov 5, 2026Install a special generator transfer switch On-Off-ON rated for outdoor use along with a special 3R Tap Box so the existWoonsocket · Electrical · Electrical · 1 · #E-26-704
- Nov 3, 2026Install standby generator at left corner of home. All clearances to be met.East Providence · Electrical · Electrical · 1 · #E-26-864
- Nov 3, 2026Upgrade electrical service to 200 ampsLincoln · Electrical · Electrical · 1 · #E-26-383
- Nov 3, 2026Relocate generator 3' for better clearancesCumberland · Electrical · Electrical · 1 · #EP-26-547
- Nov 3, 2026Water loss and fire damage in units L15(fire) L14 andL16. Determining what was affected in all unitsCranston · Electrical · Electrical · 1 · #156718
- Nov 3, 2026Replace 200 amp service Replace sub panel in basement Replace sub panel in garage Run a dryer circuit and washer circuitProvidence · Electrical · Electrical · 1 · #ELEC-26-2047
Older permit history
Filed more than 6 months ago. Shown for history; excluded from 6-month counts and rankings.
- May 13, 2026Install a house meter and 100A panel (older)Cumberland · Electrical · Electrical · 1 · #EP-26-214
Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.
License
We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence.
Is this your business?
Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.
Sources
- Burrillville OpenGov portal · retrieved Nov 13, 2026
- Central Falls OpenGov portal · retrieved Nov 13, 2026
- Coventry OpenGov portal · retrieved Nov 13, 2026
- Cranston OpenGov portal · retrieved Nov 13, 2026
- Cumberland OpenGov portal · retrieved Nov 13, 2026
- East Providence OpenGov portal · retrieved Nov 13, 2026
- Foster OpenGov portal · retrieved Nov 13, 2026
- Johnston OpenGov portal · retrieved Nov 13, 2026
- Lincoln OpenGov portal · retrieved Nov 13, 2026
- Newport OpenGov portal · retrieved Nov 13, 2026
- North Kingstown OpenGov portal · retrieved Nov 13, 2026
- North Providence OpenGov portal · retrieved Nov 13, 2026
- North Smithfield OpenGov portal · retrieved Nov 13, 2026
- Pawtucket OpenGov portal · retrieved Nov 13, 2026
- Providence OpenGov portal · retrieved Nov 13, 2026
- Scituate OpenGov portal · retrieved Nov 13, 2026
- Smithfield OpenGov portal · retrieved Nov 13, 2026
- South Kingstown OpenGov portal · retrieved Nov 13, 2026
- Warwick OpenGov portal · retrieved Nov 13, 2026
- Westerly OpenGov portal · retrieved Nov 13, 2026
- Woonsocket OpenGov portal · retrieved Nov 13, 2026
Not verified: contact info, business address, insurance, reviews. Page built Nov 15, 2026.