Directory / Providence / Electrical

Eastland Electric, Inc.

69 permits across 21 towns in the last 6 months

Electrical

Active in Providence and 14 other towns in the last 90 days

Request a quote

70documented permits
69last 6 months
37last 90 days
21towns/cities
1state
7/7months active

Activity by month

Permits filed each month. The first and last months are partial.

May 2026: 66MayJun 2026: 99JunJul 2026: 1010JulAug 2026: 1010AugSep 2026: 1212SepOct 2026: 1010OctNov 2026: 1212Nov

Where they’re working

Permits filed under this contractor by state and town, last 6 months.

Rhode Island 69

Types of projects

  • Electrical · Electrical69

Location and projects

Documented permits by town. Pins sit at each town’s center, not at job addresses.

Loading map…

By place, trade and period

Recent permits

Permit timeline: the most recent permits filed under this contractor in the last 6 months, newest first. Job values are shown only when the town record lists one.

  1. Nov 6, 2026Install 18kw standby generator. All manufacture clearances to be met. Job value $11,000East Providence · Electrical · Electrical · -1 · #E-26-876
  2. Nov 6, 2026Install standby generator at right rear of home. All manufacture clearances to be met. Job value $11,000Cumberland · Electrical · Electrical · 1 · #EP-26-554
  3. Nov 6, 2026Replace 200A Service Job value $8,900Cumberland · Electrical · Electrical · 1 · #EP-26-553
  4. Nov 6, 2026Install standby generator. All manufacture clearances to be met. Job value $11,000North Smithfield · Electrical · Electrical · 1 · #E-26-225
  5. Nov 5, 2026Inspect service due to utility disconnecting power and requiring electrical inspection to have power reinstated. No work Job value $240Providence · Electrical · Electrical · 1 · #ELEC-26-2083
  6. Nov 5, 2026Inspect service due to utility disconnecting power and requiring electrical inspection to have power reinstated. No work Job value $240Pawtucket · Electrical · Electrical · 1 · #ELEC-26-660
  7. Nov 5, 2026Install a special generator transfer switch On-Off-ON rated for outdoor use along with a special 3R Tap Box so the exist Job value $19,860Woonsocket · Electrical · Electrical · 1 · #E-26-704
  8. Nov 3, 2026Install standby generator at left corner of home. All clearances to be met. Job value $11,000East Providence · Electrical · Electrical · 1 · #E-26-864
  9. Nov 3, 2026Upgrade electrical service to 200 amps Job value $8,200Lincoln · Electrical · Electrical · 1 · #E-26-383
  10. Nov 3, 2026Relocate generator 3' for better clearances Job value $950Cumberland · Electrical · Electrical · 1 · #EP-26-547
  11. Nov 3, 2026Water loss and fire damage in units L15(fire) L14 andL16. Determining what was affected in all units Job value $1,400Cranston · Electrical · Electrical · 1 · #156718
  12. Nov 3, 2026Replace 200 amp service Replace sub panel in basement Replace sub panel in garage Run a dryer circuit and washer circuit Job value $20,000Providence · Electrical · Electrical · 1 · #ELEC-26-2047

Older permit history

Filed more than 6 months ago. Shown for history; excluded from 6-month counts and rankings.

  1. May 13, 2026Install a house meter and 100A panel (older)Cumberland · Electrical · Electrical · 1 · #EP-26-214

Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

License

We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Rhode Island Contractors' Registration and Licensing Board.

Is this your business?

Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

Claim it free Upgrade for $9/mo Get website badge

Sources

Not verified: contact info, business address, insurance, reviews. Page built Nov 17, 2026.