Directory / Falmouth / Building

William L Schmitz

8 permits across 2 towns in the last 12 months

Building

8documented permits
8last 12 months
1last 90 days
2towns/cities
1state
6/13months active

    We haven’t confirmed public business contact details for this contractor yet. You can still request a quote and we’ll pass it along once we reach them.

    Activity by month

    Permits filed each month. The first and last months are partial.

    Nov 2025: 11NovDec 2025: 0DecJan 2026: 0JanFeb 2026: 11FebMar 2026: 0MarApr 2026: 11AprMay 2026: 22MayJun 2026: 0JunJul 2026: 0JulAug 2026: 22AugSep 2026: 11SepOct 2026: 0OctNov 2026: 0Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 12 months.

    Massachusetts 8

    Types of projects

    • Building · Residential7
    • Building · Commercial1

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 12 monthsAll documented
    FalmouthMABuilding144
    BourneMABuilding044

    Permit timeline

    1. Sep 23, 2026Remodel existing kitchen area to include removal of cabinets, countertops, 1 non-bearing wall, installation of a window Falmouth · Building · Residential · Permit Issued · #R-26-2261
    2. Aug 3, 2026Alterations: remodel existing kitchen to include removal of the cabinets, flooring and wallboard ceiling. Install new blBourne · Building · Residential · Permit Issued · #B-26-356
    3. Aug 3, 2026Alterations: Remodel existing bathroom to include the removal of a drop in bathtub (replacing with free standing tub) deBourne · Building · Residential · Active · #B-26-355
    4. May 28, 2026Remodel existing kitchen to include the removal of cabinets, counters and existing backsplash. insulate walls at backsplFalmouth · Building · Residential · Closed · #R-26-1214
    5. May 5, 2026Partial remodel of existing master bathroom. will include removal of vanity, countertop and shower, while leaving the tiFalmouth · Building · Residential · Closed · #R-26-1011
    6. Apr 21, 2026Alterations: remodel existing kitchen to include removal of 1 bearing wall and installatino of a new beam and post to exBourne · Building · Commercial · Active · #B-26-170
    7. Feb 2, 2026Remodel existing kitchen to include the removal of cabinets, countertops and 1 small non bearing wall section approximatFalmouth · Building · Residential · Closed · #R-26-0257
    8. Nov 21, 2025Alterations: Remodel existing kitchen and mudroom. Remove all cabinets, countertops, kitchen flooring, mudroom flooring.Bourne · Building · Residential · Active · #B-25-416

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Massachusetts license lookup.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 5, 2026.