Directory / Attleboro / Insulation
Walter R. Colwell
8 permits across 1 town in the last 12 months
Insulation · Roofing · Building · HVAC
We haven’t confirmed public business contact details for this contractor yet. You can still request a quote and we’ll pass it along once we reach them.
Activity by month
Permits filed each month. The first and last months are partial.
Where they’re working
Permits filed under this contractor by state and town, last 12 months.
Massachusetts 8
Types of projects
By place, trade and period
| Town / city | State | Trade | Last 90 days | Last 12 months | All documented |
|---|---|---|---|---|---|
| Attleboro | MA | Insulation | 2 | 3 | 3 |
| Attleboro | MA | Roofing | 1 | 2 | 2 |
| Attleboro | MA | Building | 0 | 2 | 2 |
| Attleboro | MA | HVAC | 0 | 1 | 1 |
Permit timeline
- Oct 21, 2026Air sealing, fiberglass for attic flat, insulate & weather strip hatchAttleboro · Insulation · Residential · Permit Issued · #R-26-1746
- Oct 19, 2026Air sealing, fiberglass for damming, blown in cellulose for attic flat, pull-down stair tent, recessed light boxes, ventAttleboro · Roofing · Residential · Permit Issued · #R-26-1745
- Sep 30, 2026Insulate exterior walls & air sealingAttleboro · Insulation · Commercial · Permit Issued · #C-26-1625
- Jun 26, 2026Air sealing, weatherstrip and add door sweeps, R19 unfaced fiberglass 6" for attic space, rim joist 2" thermal boardAttleboro · Insulation · Commercial · Final Inspection · #C-26-0998
- May 22, 2026Air sealing, attic damming, attic flat 7" cellulose , basement sill, overhang 6" cellulose, overhand 2" rigid board insuAttleboro · Building · Residential · Final Inspection · #R-26-0798
- Apr 17, 2026Air sealing, duct sealing, fg for damming & sills, insulate hatch, blown in cellulose for attic flat, propavents, vent bAttleboro · HVAC · Residential · Final Inspection · #R-26-0607
- Dec 29, 2025Insulation - air sealing, ventilation chutes, insulate and weatherstrip attic hatch, insulated bath exhaust hose, R38 unAttleboro · Building · Residential · Final Inspection · #R-25-2306
- Dec 2, 2025Closed cell spray foam to roofline and gable, followed by ignition barrier paint.Attleboro · Roofing · Residential · Final Inspection · #R-25-2216
Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.
License
We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Massachusetts license lookup.
Is this your business?
Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.
Sources
- PermitEyes Attleboro public view (Building) · retrieved Nov 5, 2026
Not verified: contact info, business address, insurance, reviews. Page built Nov 5, 2026.