We haven’t confirmed public business contact details for this contractor yet. You can still request a quote and we’ll pass it along once we reach them.
Activity by month
Permits filed each month. The first and last months are partial.
Where they’re working
Permits filed under this contractor by state and town, last 12 months.
Massachusetts 11
Types of projects
By place, trade and period
| Town / city | State | Trade | Last 90 days | Last 12 months | All documented |
|---|---|---|---|---|---|
| Plymouth | MA | Roofing | 0 | 5 | 5 |
| Plymouth | MA | Siding | 1 | 3 | 3 |
| Plymouth | MA | Windows & doors | 2 | 3 | 3 |
Permit timeline
- Sep 15, 2026REMOVE AND REPLACE SIDING ONLY. NO STRUCTURAL CHANGES. FINAL INSPECTION REQUIRED.Plymouth · Siding · Repair / alteration · Permit Issued · #EX-26-1072
- Sep 14, 2026REMOVE AND REPLACE FIFTEEN (15) WINDOWS NO STRUCTURAL CHANGES; FINAL INSPECTION REQUIREDPlymouth · Windows & doors · Repair / alteration · Permit Issued · #EX-26-1096
- Aug 21, 2026REMOVE AND REPLACE EIGHT (8) WINDOWS NO STRUCTURAL CHANGES; FINAL INSPECTION REQUIREDPlymouth · Windows & doors · Repair / alteration · Permit Issued · #EX-26-987
- Jun 16, 2026REMOVE AND REPLACE ROOFING NO STRUCTURAL CHANGES; FINAL INSPECTION REQUIREDPlymouth · Roofing · Repair / alteration · Permit Issued · #EX-26-569
- Mar 24, 2026REMOVE AND REPLACE SIDING AND TWO (2) DOORS; NO STRUCTURAL CHANGES; FINAL INSPECTION REQUIREDPlymouth · Siding · Repair / alteration · Permit Issued · #EX-26-218
- Mar 16, 2026REMOVE AND REPLACE ROOFING; NO STRUCTURAL CHANGES; FINAL INSPECTION REQUIREDPlymouth · Roofing · Repair / alteration · Permit Issued · #EX-26-187
- Mar 16, 2026REMOVE AND REPLACE SIDING; NO STRUCTURAL CHANGES; FINAL INSPECTION REQUIREDPlymouth · Siding · Repair / alteration · Permit Issued · #EX-26-170
- Mar 11, 2026REMOVE AND REPLACE ROOFING & TWO (2) WINDOWS; NO STRUCTURAL CHANGES; FINAL INSPECTION REQUIREDPlymouth · Roofing · Repair / alteration · Permit Issued · #EX-26-171
- Feb 26, 2026REMOVE AND REPLACE ROOFING; NO STRUCTURAL CHANGES; FINAL INSPECTION REQUIREDPlymouth · Roofing · Repair / alteration · Permit Issued · #EX-26-145
- Feb 26, 2026REMOVE AND REPLACE ROOFING; NO STRUCTURAL CHANGES; FINAL INSPECTION REQUIREDPlymouth · Roofing · Repair / alteration · Permit Issued · #EX-26-151
- Feb 21, 2026REMOVE AND REPLACE EIGHT (8) WINDOWS; NO STRUCTURAL CHANGES; FINAL INSPECTION REQUIREDPlymouth · Windows & doors · Repair / alteration · Permit Issued · #EX-26-138
Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.
License
We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Massachusetts license lookup.
Is this your business?
Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.
Sources
- Town of Plymouth Inspectional Services monthly Permits Issued reports · retrieved Nov 4, 2026
Not verified: contact info, business address, insurance, reviews. Page built Nov 5, 2026.