Directory / Bellingham / Solar

Sunrun Installation Services

202 permits across 1 town in the last 12 months

Solar · Electrical · Building

202documented permits
202last 12 months
60last 90 days
1town/city
1state
13/13months active

    We haven’t confirmed public business contact details for this contractor yet. You can still request a quote and we’ll pass it along once we reach them.

    Activity by month

    Permits filed each month. The first and last months are partial.

    Nov 2025: 1111NovDec 2025: 1111DecJan 2026: 99JanFeb 2026: 1313FebMar 2026: 1919MarApr 2026: 1414AprMay 2026: 1717MayJun 2026: 2424JunJul 2026: 1717JulAug 2026: 3030AugSep 2026: 2121SepOct 2026: 1212OctNov 2026: 44Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 12 months.

    Massachusetts 202

    Types of projects

    • Solar · SOLAR91
    • Solar · ELECT88
    • Electrical · ELECT22
    • Building · RESI1

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 12 monthsAll documented
    BellinghamMASolar53179179
    BellinghamMAElectrical72222
    BellinghamMABuilding011

    Permit timeline

    1. Nov 3, 2026SPAN MAIN PANEL REQUIREDBellingham · Electrical · ELECT · Permit Issued · #E-26-0559
    2. Nov 2, 2026INSTALLATION OF 1 TESLA: POWERWALL 3, 13.5KWH LITHIUM ION BATTERY - EXISTING SOLAR SYSTEMBellingham · Solar · SOLAR · Permit Issued · #S-26-0106
    3. Nov 2, 2026MAIN PANEL REPLACEMENT REQUIREDBellingham · Electrical · ELECT · Permit Issued · #E-26-0555
    4. Nov 2, 2026INSTALLATION OF 1 TESLA: POWERWALL 3, 13.5KWH LITHIUM ION BATTERY - EXISTING SOLAR SYSTEMBellingham · Solar · ELECT · Permit Issued · #E-26-0557
    5. Oct 30, 2026MAIN PANEL REPLACEMENT REQUIREDBellingham · Electrical · ELECT · Permit Issued · #E-26-0552
    6. Oct 19, 2026INSTALLATION OF AN INTERCONNECTED ROOFTOP PV SYSTEM 29 PANELS 11.89KWDC - NO ESSBellingham · Solar · ELECT · Permit Issued · #E-26-0526
    7. Oct 19, 2026INSTALLATION OF AN INTERCONNECTED ROOFTOP PV SYSTEM 29 PANELS 11.89KWDC - NO ESS NO STRUCTURALBellingham · Solar · SOLAR · Permit Issued · #S-26-0099
    8. Oct 14, 2026INSTALLATION OF AN INTERCONNECTED ROOFTOP PV SYSTEM 15 PANELS 5.925KWDC AND 1 TESLA: POWERWALL 3, 13.5KWH LITHIUM ION BABellingham · Solar · ELECT · Permit Issued · #E-26-0521
    9. Oct 14, 2026INSTALLATION OF AN INTERCONNECTED ROOFTOP PV SYSTEM 15 PANELS 5.925KWDC AND 1 TESLA: POWERWALL 3, 13.5KWH LITHIUM ION BABellingham · Solar · SOLAR · Permit Issued · #S-26-0097
    10. Oct 14, 2026METER ENCLOSURE REPLACEMENT REQUIREDBellingham · Electrical · ELECT · Permit Issued · #E-26-0540
    11. Oct 14, 2026INSTALLATION OF AN INTERCONNECTED ROOFTOP PV SYSTEM 18 PANELS 7.11KWDC AND 1 TESLA: POWERWALL 3, 13.5KWH LITHIUM ION BATBellingham · Solar · ELECT · Permit Issued · #E-26-0547
    12. Oct 14, 2026INSTALLATION OF AN INTERCONNECTED ROOFTOP PV SYSTEM 18 PANELS 7.11 KWDC AND 1 TESLA: POWERWALL 3, 13.5KWH LITHIUM ION BABellingham · Solar · SOLAR · Permit Issued · #S-26-0100

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Massachusetts license lookup.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 5, 2026.