Business contact from Town of Needham issued-permit PDF report, checked Aug 14, 2026. Not from permit records.
Activity by month
Permits filed each month. The first and last months are partial.
Where they’re working
Permits filed under this contractor by state and town, last 6 months.
Massachusetts 1
Types of projects
By place, trade and period
| Town / city | State | Trade | Last 90 days | Last 6 months | All documented |
|---|---|---|---|---|---|
| Needham | MA | Building | 1 | 1 | 1 |
| Needham | MA | Site work | 0 | 0 | 1 |
Permit timeline
- Aug 14, 2026Jackhammering out old concrete steps and concrete walkway. Excavating dirt. Form and install rebar. Drill rebar into houNeedham · Building · Residential · John · #BR-26-10708
Older permit history
Filed more than 6 months ago. Shown for history; excluded from 6-month counts and rankings.
- Mar 27, 2026Removing old precast concrete steps and railings. Excavating for new concrete footing. Building new 6' solid (older)Needham · Site work · Residential · Glen · #BR-26-10211
Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.
License
We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Massachusetts license lookup.
Is this your business?
Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.
Sources
- Needham quarterly Building Permits Issued (DocumentCenter PDF) · retrieved Nov 9, 2026
Not verified: contact info, business address, insurance, reviews. Page built Nov 9, 2026.