Directory

Sol Power, LLC

91 permits across 24 towns in the last 6 months

Solar · Electrical

91documented permits
91last 6 months
36last 90 days
24towns/cities
1state
7/7months active

    Business contact from Warwick OpenGov record (signed-in), checked Nov 13, 2026. Not from permit records.

    Activity by month

    Permits filed each month. The first and last months are partial.

    May 2026: 1111MayJun 2026: 1515JunJul 2026: 2323JulAug 2026: 77AugSep 2026: 77SepOct 2026: 1313OctNov 2026: 1515Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 6 months.

    RI 91

    Types of projects

    • Solar · Electrical85
    • Electrical · Electrical6

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 6 monthsAll documented
    WesterlyRISolar71616
    South KingstownRISolar11212
    NarragansettRISolar499
    ProvidenceRISolar477
    North KingstownRISolar344
    CranstonRISolar244
    WarwickRISolar244
    CumberlandRISolar333
    HopkintonRISolar033
    East ProvidenceRISolar033
    RichmondRISolar033
    NewportRISolar122
    WesterlyRIElectrical222
    GlocesterRISolar122
    South KingstownRIElectrical122
    BarringtonRISolar122
    LincolnRISolar022
    PawtucketRISolar022
    JohnstonRISolar111
    East GreenwichRISolar111
    PortsmouthRIElectrical111
    MiddletownRISolar111
    WoonsocketRISolar011
    North ProvidenceRISolar011
    BurrillvilleRISolar011
    PawtucketRIElectrical011
    Little ComptonRISolar011

    Permit timeline

    1. Nov 12, 2026Solar PermitSouth Kingstown · Solar · Electrical · 1 · #96069
    2. Nov 11, 2026Solar PermitNewport · Solar · Electrical · 1 · #S-26-24
    3. Nov 11, 2026Installation of 20-440W rooftop mounted solar panels with all required disconnects. Net metered solar with BESS. BatteriWesterly · Solar · Electrical · 1 · #S-26-64
    4. Nov 11, 2026Installation of 1-Tesla Powerwall 3 and 1-Tesla DC Expansion pack with all required disconnects integrated with existingProvidence · Solar · Electrical · 1 · #ELEC-26-2133
    5. Nov 10, 2026Solar PermitNarragansett · Solar · Electrical · 1 · #S-26-50
    6. Nov 10, 2026Installation of: Full 200-Amp Electrical Service Revamp - New electrical panel and circuit breakers - New meter socket aWesterly · Electrical · Electrical · 1 · #E-26-552
    7. Nov 5, 2026Solar PermitProvidence · Solar · Electrical · -1 · #SOL-26-204
    8. Nov 5, 2026Installation of 10-440W rooftop mounted solar PV panels with all required disconnects. Net meter solar with BESS. 1-TeslWesterly · Solar · Electrical · 1 · #S-26-63
    9. Nov 5, 2026Installation of 33-440W rooftop mounted panels with all required disconnects. Net metered solar with ESS. 2-Tesla PowerwWesterly · Solar · Electrical · 1 · #S-26-62
    10. Nov 5, 2026Solar Energy System and Battery Storage Unit PermitGlocester · Solar · Electrical · 1 · #S-26-19
    11. Nov 4, 2026Installation of 23-440W rooftop mounted PV panels with all required disconnects. Net metered solar with NO BESS. * Per NNorth Kingstown · Solar · Electrical · 1 · #3025
    12. Nov 4, 2026Installation of 18-440W rooftop mounted PV panels with all required disconnects. Net metered solar with NO BESS.Cranston · Solar · Electrical · 1 · #156762

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 13, 2026.