Directory / Cambridge / Electrical

Shawn R Leahy

23 permits across 1 town in the last 12 months

Electrical

23documented permits
23last 12 months
0last 90 days
1town/city
1state
8/13months active

    We haven’t confirmed public business contact details for this contractor yet. You can still request a quote and we’ll pass it along once we reach them.

    Activity by month

    Permits filed each month. The first and last months are partial.

    Nov 2025: 22NovDec 2025: 22DecJan 2026: 66JanFeb 2026: 44FebMar 2026: 11MarApr 2026: 11AprMay 2026: 11MayJun 2026: 66JunJul 2026: 0JulAug 2026: 0AugSep 2026: 0SepOct 2026: 0OctNov 2026: 0Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 12 months.

    Massachusetts 23

    Types of projects

    • Electrical · Electrical23

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 12 monthsAll documented
    CambridgeMAElectrical02323

    Permit timeline

    1. Jun 30, 2026Electrical: disconnect and pull back existing feeds to existing pumps.  Reconnect existing feeds to new pumps. Install nCambridge · Electrical · Electrical · Active · #1464101
    2. Jun 30, 2026Electrical: disconnect and pull back existing feeds to existing pumps.  Reconnect existing feeds to new pumps. Install nCambridge · Electrical · Electrical · Active · #1464103
    3. Jun 22, 2026Electrical: Demo and Install feeds and disconnect switches to Pumps.Cambridge · Electrical · Electrical · Active · #1461800
    4. Jun 12, 2026Electrical: Furnish & install  33 data locations - Floors: 3, 4, 5, 6, 7, 9, 10, 12, 13, 14Cambridge · Electrical · Electrical · Active · #1459539
    5. Jun 4, 2026Electrical: 5th floor   5 data locations consisting of 2 data cables   7th floor  Rework 5 existing data and add 3 data Cambridge · Electrical · Electrical · Active · #1457425
    6. Jun 4, 2026Electrical: Electrical installation for Heating System UpgradeCambridge · Electrical · Electrical · Active · #1457560
    7. May 15, 2026Electrical: Disconnect existing 30-Amp, 208V feeder to an existing unit. Reconnect to a new HVAC unit for the system, inCambridge · Electrical · Electrical · Active · #1453335
    8. Apr 28, 2026Electrical: 5th floor  2 IDF Buildouts with wall mount racksCambridge · Electrical · Electrical · Complete · #1448559
    9. Mar 24, 2026Electrical: Add (1) 208v Panel,  replace lighting & lighting controls,  add circuits and outlets in Kitchenette areaAdd Cambridge · Electrical · Electrical · Active · #1440205
    10. Feb 20, 2026Electrical: 1st Floor Fitness Center FitoutCambridge · Electrical · Electrical · Complete · #1432892
    11. Feb 20, 2026Electrical: 10th Floor Conference Center FitoutCambridge · Electrical · Electrical · Complete · #1432895
    12. Feb 19, 2026Electrical: Replace (2) existing ASCO automatic transfer switches with (2) new Russ Electric automatic transfer switchesCambridge · Electrical · Electrical · Active · #1432653

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Massachusetts license lookup.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 5, 2026.