Directory

Scott Adler Adler

12 permits across 1 town in the last 6 months

Site work

12documented permits
12last 6 months
7last 90 days
1town/city
1state
4/7months active

    Business contact from Providence OpenGov record (signed-in), checked Nov 13, 2026. Not from permit records.

    Activity by month

    Permits filed each month. The first and last months are partial.

    May 2026: 0MayJun 2026: 0JunJul 2026: 55JulAug 2026: 0AugSep 2026: 22SepOct 2026: 22OctNov 2026: 33Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 6 months.

    RI 12

    Types of projects

    • Site work · Trench12

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 6 monthsAll documented
    ProvidenceRISite work71212

    Permit timeline

    1. Nov 5, 2026We are installing a catch basin and water quality unit in the parking lot which will tie into an existing 5" clay lateraProvidence · Site work · Trench · 1 · #ENG-26-2320
    2. Nov 4, 2026Replace existing catch basin with drainage manhole, add water quality unit, add new catch basin, and tie into existion dProvidence · Site work · Trench · 1 · #SEW-26-273
    3. Nov 4, 2026Install a catch basin and water quality unit in the parking lot which will tie into an existing 5" clay lateral thatbranProvidence · Site work · Trench · 1 · #SEW-26-272
    4. Oct 29, 2026Sewer PermitProvidence · Site work · Trench · 0 · #440946
    5. Oct 29, 2026Cut and cap existing waterline at property lineProvidence · Site work · Trench · 1 · #ENG-26-2275
    6. Sep 28, 2026Excavate into sidewalk only to connect to new poleProvidence · Site work · Trench · 1 · #ENG-26-2034
    7. Sep 2, 2026Excavate in sidewalk for water line installation from stub provided by Prov Water to buildingProvidence · Site work · Trench · 1 · #ENG-26-1811
    8. Jul 20, 2026Cut and cap existing water serviceProvidence · Site work · Trench · 1 · #ENG-26-1465
    9. Jul 20, 2026Cut and cap sewer in sidewalkProvidence · Site work · Trench · 1 · #ENG-26-1464
    10. Jul 8, 2026Replace existing sewer serviceProvidence · Site work · Trench · 1 · #SEW-26-148
    11. Jul 8, 2026Remove reset curb and driveway openings, remove and replace sidewalks on Seekonk St and Butler AvProvidence · Site work · Trench · 1 · #ENG-26-1380
    12. Jul 8, 2026Excavate in sidewalk and Seekonk St to replace Existing Sewer lineProvidence · Site work · Trench · 1 · #ENG-26-1381

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 13, 2026.