Rocky Coast Electric
14 permits across 2 towns in the last 6 months
Building · Swimming pools · HVAC
Business contact from Lewiston EnerGov permit-detail contacts (ME), checked Nov 9, 2026. Not from permit records.
Activity by month
Permits filed each month. The first and last months are partial.
Where they’re working
Permits filed under this contractor by state and town, last 6 months.
ME 14
Types of projects
By place, trade and period
| Town / city | State | Trade | Last 90 days | Last 6 months | All documented |
|---|---|---|---|---|---|
| Lewiston | ME | Building | 7 | 12 | 12 |
| Lewiston | ME | Swimming pools | 1 | 1 | 1 |
| Westbrook | ME | HVAC | 0 | 1 | 1 |
Permit timeline
- Nov 9, 2026(1) New build - single family home - 70 openings, 200-amp Service, 200-amp PanelLewiston · Building · Residential - Electrical · Issued · #ELEC-01474-2026
- Nov 9, 2026(1) New build - garage - installing (40) openings, outlets, switches lights, GFIC/AFCI, Garage openerLewiston · Building · Residential - Electrical · Issued · #ELEC-01475-2026
- Nov 5, 2026Installing (2) bathroom fan combos.Lewiston · Building · Commercial - Electrical · Issued · #ELEC-01470-2026
- Sep 17, 202640 AMP-240V Dedicated Circuit from Panel to Electrical Range - 40AM0 GFI Breaker - Clean up (3) existing flying spilicecLewiston · Building · Residential - Electrical · Issued · #ELEC-01371-2026
- Sep 16, 2026Installing (1) leg switch to control (5) lights. - Installing (5) lights - (2) 20 amp dedicated for garage - 20 am ded GLewiston · Building · Residential - Electrical · Issued · #ELEC-01366-2026
- Aug 27, 2026Installing Dedicated 20AMP outlet outside Running wire from panel to Exterior spa disconnect Adding (1) breaker to panelLewiston · Swimming pools · Residential - Electrical · Pending · #ELEC-01328-2026
- Aug 26, 2026Upgrading the 100AMP panel basic.Lewiston · Building · Residential - Electrical · Issued · #ELEC-01325-2026
- Aug 25, 2026Installing a receptacle in apartment 5 bedroom (Outlet routed from basement to upper floors using conduit fitting with wLewiston · Building · Commercial - Electrical · Issued · #ELEC-01322-2026
- Jul 7, 2026House: 100amp panel, 1st floor 20amp washer, 20amp dryer, GFI 30amp breaker replacing all switches/outlets 2 gang switchLewiston · Building · Commercial - Electrical · Issued · #ELEC-01224-2026
- Jul 7, 2026Garage: 100Amp subpanel, 200AMP panel, 200AMP service upgrade. 1 outdoor rece, dedicated home run, 12-LED light strips, Lewiston · Building · Commercial - Electrical · Issued · #ELEC-01223-2026
- Jun 23, 2026HEAT PUMP SYSTEMS PERMIT (Residential & Commercial)Westbrook · HVAC · Sheet metal · Issued · #26-000559
- Jun 22, 2026Installing (2) dedicated home run circuits to 3rd floor unit, installing (2) dedicated outs and (2) AFCI breakers to exiLewiston · Building · Commercial - Electrical · Issued · #ELEC-01197-2026
Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.
License
We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence.
Is this your business?
Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.
Sources
- Lewiston EnerGov Civic Self Service (permit-detail contacts) · retrieved Nov 15, 2026
- Westbrook posted permit reports · retrieved Nov 15, 2026
Not verified: contact info, business address, insurance, reviews. Page built Nov 15, 2026.