Business contact from Warwick OpenGov record (signed-in), checked Nov 13, 2026. Not from permit records.
Activity by month
Permits filed each month. The first and last months are partial.
Where they’re working
Permits filed under this contractor by state and town, last 6 months.
Rhode Island 3
Types of projects
By place, trade and period
| Town / city | State | Trade | Last 90 days | Last 6 months | All documented |
|---|---|---|---|---|---|
| Glocester | RI | Building | 1 | 1 | 1 |
| Warwick | RI | Building | 0 | 1 | 1 |
| Richmond | RI | Roofing | 0 | 1 | 1 |
| Warwick | RI | Decks & porches | 0 | 0 | 1 |
Permit timeline
- Oct 13, 2026We propose to build new 2 car garage with bonus room on second floor above garage. Lean-to covered proch with cement slaGlocester · Building · Residential · 1 · #B-26-329
- Jul 13, 2026Per the set of drawings, we will be demoing exiting porch fully then pouring frost wall/slab foundation 4' crawspace to Warwick · Building · Residential · 1 · #5250
- Jul 1, 2026Plan is to demo existing roof over existing first floor ranch to build second story to include new master bedroom, masteRichmond · Roofing · Residential · 1 · #8058
Older permit history
Filed more than 6 months ago. Shown for history; excluded from 6-month counts and rankings.
- May 12, 2026This existing deck was refinished with new materials including composite decking and a new railing system. Attached to t (older)Warwick · Decks & porches · Residential · -1 · #3415
Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.
License
We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Rhode Island Contractors' Registration and Licensing Board.
Is this your business?
Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.
Sources
- Glocester OpenGov portal · retrieved Nov 13, 2026
- Richmond OpenGov portal · retrieved Nov 13, 2026
- Warwick OpenGov portal · retrieved Nov 13, 2026
Not verified: contact info, business address, insurance, reviews. Page built Nov 13, 2026.