Paul Campbell
14 permits across 1 town in the last 6 months
Building · Electrical · Roofing
We haven’t confirmed public business contact details for this contractor yet. You can still request a quote and we’ll pass it along once we reach them.
Activity by month
Permits filed each month. The first and last months are partial.
Where they’re working
Permits filed under this contractor by state and town, last 6 months.
Massachusetts 14
Types of projects
By place, trade and period
| Town / city | State | Trade | Last 90 days | Last 6 months | All documented |
|---|---|---|---|---|---|
| Boston | MA | Building | 6 | 11 | 17 |
| Boston | MA | Electrical | 1 | 3 | 6 |
| Boston | MA | Roofing | 0 | 0 | 1 |
Permit timeline
- Nov 3, 2026Interior renovation: Build 3 new office, one new conference room, new kitchen flooring and paint per plans.[ePlans]Boston · Building · Commercial · Open · #ALT1902768
- Oct 22, 2026Interior renovation: 5ft Floor existing office. Start framing of three new meeting rooms while waiting ALT1910104.Boston · Building · Commercial · Open · #SF1910108
- Sep 29, 2026Interior renovation: Existing tenant 2nd floor. Replace existing kitchen counter top. Install new Mother Room cabinets aBoston · Building · Commercial · Open · #SF1904846
- Sep 25, 2026Electrical: Service upgrade to 400 AMP service - Kitchen remodel 1st floor unit & 2nd floor unitBoston · Electrical · Electrical · Open · #E1902798
- Sep 22, 2026Interior renovation: Mobilize and start Framing work while waiting for ALT 1902768 to be issued.Boston · Building · Commercial · Open · #SF1902783
- Sep 22, 2026Interior renovation: 8th Floor Add three new offices. Carpet and paint.Boston · Building · Commercial · Open · #SF1902789
- Sep 22, 2026Interior renovation: 4th Floor Suite. Remove three existing offices. Patch carpet and paint touch ups.Boston · Building · Commercial · Open · #SF1902790
- Jul 14, 2026Interior renovation: Install new pass through window in existing interior reception.Boston · Building · Commercial · Open · #SF1871632
- Jul 14, 2026Interior renovation: Split one existing large office in two. Repair flooring, act and paint.Boston · Building · Commercial · Open · #SF1871636
- Jul 7, 2026Electrical: kitchen renovation, adding receptacles throughout apartment, replacing light fixtures throughout apartmentBoston · Electrical · Electrical · Closed · #E1869512
- Jul 7, 2026Interior renovation: Renovation to existing amenity center to include new partitions, millwork, act, flooring and paint.Boston · Building · Commercial · Open · #SF1868412
- Jun 26, 2026Electrical: Install temporary feed to (2) exterior office trailers- 60AMP feedBoston · Electrical · Electrical · Open · #E1864717
Older permit history
Filed more than 6 months ago. Shown for history; excluded from 6-month counts and rankings.
- Apr 6, 2026Other: Generator support work. Permit needed to book inspector for after hours testing of life safety generator. BFD per (older)Boston · Building · Commercial · Open · #SF1829806
- Apr 2, 2026Electrical: Bring Unit L101 up to code compliance - unit feeder - upgrade from 60AMP to 100AMP for meter installation (older)Boston · Electrical · Electrical · Closed · #E1835499
- Mar 25, 2026Interior renovation: Interior non structural office demolition. White box in preparation of tenant fit out which will fo (older)Boston · Building · Commercial · Open · #ALT1807239
- Mar 20, 2026Electrical: Remove under cabinet electrical to facilitate plumbing rise repair (older)Boston · Electrical · Electrical · Closed · #E1829625
- Feb 25, 2026Interior renovation: Mobilize and start framing while waiting for ALT 1819987. Total cost declared on the ALT Applicatio (older)Boston · Building · Commercial · Closed · #SF1822211
- Feb 25, 2026Interior renovation: 3rd floor. Remove one piece shower unit. Repair wall and ceiling. (older)Boston · Building · Commercial · Open · #SF1823222
- Feb 19, 2026Interior renovation: 1st Floor install kitchen cabinets at existing kitchen, repair existing conference room walls, inst (older)Boston · Building · Commercial · Open · #SF1821464
- Feb 10, 2026Roofing: Repair holes in rubber roof. (older)Boston · Roofing · Commercial · Open · #SF1819069
- Dec 22, 2025Interior renovation: Applying for Short Form permit to start selective non structural demolition work while waiting for (older)Boston · Building · Commercial · Open · #SF1807243
- Dec 2, 2025Electrical: respond to emergency -fire in outlet-BFD dispatched-electrical fire in wall-disconnected outlet-electric hea (older)Boston · Electrical · Electrical · Open · #E1803238
Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.
License
We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Massachusetts license lookup.
Is this your business?
Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.
Sources
- Analyze Boston: Approved Building Permits · retrieved Nov 9, 2026
Not verified: contact info, business address, insurance, reviews. Page built Nov 12, 2026.