Directory / Bristol / Electrical
MC Electrical Contracting LLC
17 permits across 4 towns in the last 6 months
Electrical · Solar
Business contact from Bristol OpenGov record (signed-in), checked Nov 13, 2026. Not from permit records.
Activity by month
Permits filed each month. The first and last months are partial.
Where they’re working
Permits filed under this contractor by state and town, last 6 months.
Connecticut 17
Types of projects
By place, trade and period
| Town / city | State | Trade | Last 90 days | Last 6 months | All documented |
|---|---|---|---|---|---|
| Bristol | CT | Electrical | 5 | 7 | 7 |
| West Hartford | CT | Electrical | 1 | 6 | 8 |
| Meriden | CT | Electrical | 1 | 2 | 2 |
| Manchester | CT | Solar | 1 | 1 | 1 |
| Meriden | CT | Solar | 0 | 1 | 1 |
Permit timeline
- Nov 6, 2026Electrical PermitBristol · Electrical · Electrical · 1 · #E-26-770
- Nov 3, 2026Electrical PermitBristol · Electrical · Electrical · 1 · #E-26-753
- Oct 24, 2026Electrical Permit: Install new feed for ductless heat pump.West Hartford · Electrical · ELECTRICAL · Issued · #PREL202606267
- Sep 30, 2026Utilize existing circuit for new ductless heat pump system. Install outdoor GFCI near heat pump.Meriden · Electrical · Electrical · 1 · #ELCT-26-264
- Sep 23, 2026Electrical PermitBristol · Electrical · Electrical · 1 · #E-26-655
- Sep 21, 2026Electrical PermitBristol · Electrical · Electrical · Complete · #E-26-643
- Sep 1, 2026Electrical PermitBristol · Electrical · Electrical · 1 · #E-26-576
- Aug 31, 2026Installation of 6.300kw roof mounted solar system. With 14 modules and 14 microinverters. Upgrade main service panel to Manchester · Solar · Residential PV Installation - Roof Mount · Issued · #ER-019274-2026
- Aug 10, 2026Electrical PermitBristol · Electrical · Electrical · 1 · #E-26-514
- Jul 22, 2026Installation of Tesla Ev car charger to be installed the garage. Install EV load shed module for car charger.Meriden · Electrical · Electrical · 1 · #ELCT-26-125
- Jul 16, 2026Installation of 14.62kw roof mounted solar system with 34 modules and 34 microinverters. No structural upgrades.Meriden · Solar · Electrical · 1 · #ELCT-26-115
- Jul 14, 2026Electrical Permit: Electrical Service Upgrade 200 amps to 200 amps and relocate electrical meter to the left side of theWest Hartford · Electrical · ELECTRICAL · Issued · #PREL202603984
Older permit history
Filed more than 6 months ago. Shown for history; excluded from 6-month counts and rankings.
- May 11, 2026Electrical Permit: Install GFCI breaker for AC condenser (older)West Hartford · Electrical · ELECTRICAL · Issued · #PREL202602408
- May 3, 2026Electrical Permit: Install new circuit to boiler. Run new thermostat wire from boiler to first floor. (older)West Hartford · Electrical · ELECTRICAL · Issued · #PREL202602200
Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.
License
We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Connecticut eLicense (Department of Consumer Protection) license lookup.
Is this your business?
Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.
Sources
- Bristol OpenGov portal · retrieved Nov 13, 2026
- Manchester CT EnerGov Civic Self Service · retrieved Nov 13, 2026
- Meriden OpenGov portal · retrieved Nov 13, 2026
- West Hartford Building Division monthly permit reports · retrieved Nov 13, 2026
Not verified: contact info, business address, insurance, reviews. Page built Nov 14, 2026.