Business contact from Portland EnerGov permit-detail contacts (ME), checked Jul 14, 2026. Not from permit records.
Activity by month
Permits filed each month. The first and last months are partial.
Where they’re working
Permits filed under this contractor by state and town, last 6 months.
Maine 11
Types of projects
Location and projects
Documented permits by town. Pins sit at each town’s center, not at job addresses.
Loading map…
By place, trade and period
| Town / city | State | Trade | Last 90 days | Last 6 months | All documented |
|---|---|---|---|---|---|
| Portland | ME | Roofing | 0 | 4 | 4 |
| Kennebunkport | ME | Solar | 1 | 2 | 2 |
| Portland | ME | Solar | 0 | 2 | 2 |
| Lewiston | ME | Building | 1 | 1 | 1 |
| York | ME | Solar | 1 | 1 | 1 |
| Lewiston | ME | Roofing | 0 | 1 | 1 |
Recent permits
Permit timeline: the most recent permits filed under this contractor in the last 6 months, newest first. Job values are shown only when the town record lists one.
- Sep 22, 2026Solar Array Installation - Roof Mount - System Size 33.88 kw - Number of Panels: 77Lewiston · Building · Commercial - Electrical · Approved · #ELEC-01378-2026
- Sep 1, 2026Building Permit: Solar Array Installation, Roof Mount, System Size: 8.7 kw, Number of Panels: 20 Job value $28,275Kennebunkport · Solar · ELECTRICAL · Issued · #BLDG-26-0302
- Aug 18, 2026Solar Array Installation, Roof Mount, System Size:12.32 kw, Number of Panels: 28York · Solar · Electrical · Complete · #YSLR-26-23
- Jul 27, 2026Solar Array Installation - roof top - System Size: 10.875 kw, Number of Panels: 25Lewiston · Roofing · Residential - Electrical · Issued · #ELEC-01257-2026
- Jul 21, 2026Approved Building Permit # BLDR2026-06135 Solar Array Installation, Roof Mount, System Size:10.875 kw, Number of Panels:Portland · Solar · Electrical Permit · Complete · #ELEC2026-13726
- Jul 21, 2026Approved Building Permit number BLDR2026-06122 Solar Array Installation, Roof Mount, System Size:6.09 kw, Number of PanePortland · Solar · Electrical Permit · Complete · #ELEC2026-13722
- Jul 14, 2026Solar Array Installation, Roof Mount, System Size: 4.35 kw, Number of Panels: 10Portland · Roofing · Residential Alterations (1 and 2 Family) · Withdrawn · #BLDR2026-06154
- Jul 10, 2026Solar Array Installation, Roof Mount, System Size: 6.96 kw, Number of Panels: 16Portland · Roofing · Residential Alterations (1 and 2 Family) · Complete · #BLDR2026-06148
- Jul 6, 2026Solar Array Installation, Roof Top, System Size: 10.875 kw, Number of Panels: 25Portland · Roofing · Residential Alterations (1 and 2 Family) · Complete · #BLDR2026-06135
- Jun 26, 2026Install Roof Top Solar Array: System Size: 6.09 kw, Number of Panels: 14Portland · Roofing · Residential Alterations (1 and 2 Family) · Complete · #BLDR2026-06122
- Jun 15, 2026Building & Growth Permit: Solar Array Installation, Roof Top, System Size: 7.04 kw, Number of Panels: 16 Job value $22,528Kennebunkport · Solar · ELECTRICAL · Issued · #BLDG-26-0169
Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.
License
We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Maine ALMS Online license search (Office of Professional and Occupational Regulation).
Is this your business?
Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.
Sources
- Kennebunkport posted permit reports · retrieved Nov 15, 2026
- Lewiston EnerGov Civic Self Service (permit-detail contacts) · retrieved Nov 15, 2026
- Portland EnerGov Civic Self Service (permit-detail contacts) · retrieved Nov 15, 2026
- York OpenGov portal · retrieved Nov 15, 2026
Not verified: contact info, business address, insurance, reviews. Page built Nov 15, 2026.