M & S Mechanical Services
10 permits across 2 towns in the last 6 months
HVAC · Roofing · Building · Concrete
Active in Manhattan in the last 90 days
Activity by month
Permits filed each month. The first and last months are partial.
Where they’re working
Permits filed under this contractor by state and town, last 6 months.
New York 10
Types of projects
Location and projects
Documented permits by town. Pins sit at each town’s center, not at job addresses.
Loading map…
By place, trade and period
| Town / city | State | Trade | Last 90 days | Last 6 months | All documented |
|---|---|---|---|---|---|
| Manhattan | NY | HVAC | 3 | 5 | 5 |
| Manhattan | NY | Roofing | 2 | 2 | 2 |
| Manhattan | NY | Building | 1 | 1 | 1 |
| Manhattan | NY | Concrete | 1 | 1 | 1 |
| Brooklyn | NY | HVAC | 0 | 1 | 1 |
Recent permits
Permit timeline: the most recent permits filed under this contractor in the last 6 months, newest first. Job values are shown only when the town record lists one.
- Sep 21, 2026Mechanical Systems: Removal and replacement of glycol water supply and return lines for the heat exchange system, includ Job value $2,200,000Manhattan · HVAC · Sheet metal · Permit Issued · #M01277167-I1-MS
- Sep 3, 2026General Construction: Minor interior demolition: create openings for new louvers and installation of new louvers on the Job value $600,000Manhattan · Building · Commercial · Permit Issued · #M01103404-I1-GC
- Sep 3, 2026Structural: Structural Modifications: Replacement of existing concrete pads with new and installation of structural stee Job value $250,000Manhattan · Concrete · Commercial · Permit Issued · #M01103509-I1-ST
- Sep 3, 2026Mechanical Systems: Modifications to the existing HVAC System: Removal and replacement of HVAC equipment and system, inc Job value $15,000,000Manhattan · HVAC · Sheet metal · Permit Issued · #M01103558-I1-MS
- Aug 27, 2026Mechanical Systems: NEW MECHANICAL EQUIPMENT, DUCTWORK, DUCT ACCESSORIES, HANGERS, SUPPORT, ETC. AS NOTED ON MECHANICAL Job value $757,750Manhattan · HVAC · Sheet metal · Permit Issued · #M01404391-S1-MS
- Aug 19, 2026General Construction: INSTALLATION OF PUMP ROOM AT CELLAR LEVEL, FILL BOX AT STREET LEVEL, PIPING TO RUN FROM CELLAR TO Job value $414,000Manhattan · Roofing · Commercial · Permit Issued · #M01404391-I1-GC
- Aug 19, 2026Structural: STRUCTURAL FRAMING FOR NEW ROOFTOP GENERATOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Job value $50,000Manhattan · Roofing · Commercial · Permit Issued · #M01404391-S3-ST
- Aug 11, 2026Mechanical Systems: Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupa Job value $74,995Manhattan · HVAC · Sheet metal · Permit Issued · #M01403874-I1-MS
- Aug 3, 2026Mechanical Systems: Modifications to the existing HVAC System: Remove existing AC Unit and Install new unit and associat Job value $541,700Manhattan · HVAC · Sheet metal · Permit Issued · #M01405378-I1-MS
- Jun 18, 2026Mechanical Systems: MECHANICAL MODIFICATIONS AND ASSOCIATED DUCTWORK AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR Job value $60,000Brooklyn · HVAC · Sheet metal · Signed-off · #B01398012-I1-MS
Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.
License
We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the NYC DOB license search (BIS).
Is this your business?
Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.
Sources
- NYC DOB permits (Brooklyn) · retrieved Nov 15, 2026
- NYC DOB permits (Manhattan) · retrieved Nov 15, 2026
Not verified: contact info, business address, insurance, reviews. Page built Nov 15, 2026.