Directory / Cambridge / HVAC

James Baldasaro

13 permits across 5 towns in the last 6 months

HVAC

24documented permits
13last 6 months
5last 90 days
5towns/cities
1state
6/7months active

    We haven’t confirmed public business contact details for this contractor yet. You can still request a quote and we’ll pass it along once we reach them.

    Activity by month

    Permits filed each month. The first and last months are partial.

    May 2026: 22MayJun 2026: 33JunJul 2026: 11JulAug 2026: 22AugSep 2026: 11SepOct 2026: 44OctNov 2026: 0Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 6 months.

    Massachusetts 13

    Types of projects

    • HVAC · Sheet metal13

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 6 monthsAll documented
    CambridgeMAHVAC468
    AttleboroMAHVAC034
    FalmouthMAHVAC022
    MansfieldMAHVAC112
    LexingtonMAHVAC018

    Permit timeline

    1. Oct 14, 2026F&i rtu, humidifier, dss, supply & exhaust vavs, exhaust fans, elec heaters, rgds. furnish stands, hangers, & curbs. insMansfield · HVAC · Sheet metal · Permit Issued · #MEC-26-0819
    2. Oct 13, 2026Mechanical (HVAC): RenovationCambridge · HVAC · Sheet metal · Active · #1489950
    3. Oct 13, 2026Sheet metal (HVAC ductwork): - Make safe, cut, cap, and drop- Furnish and install new duct- Furnish and install RGDs- FuCambridge · HVAC · Sheet metal · Active · #1489952
    4. Oct 1, 2026Mechanical (HVAC): RenovationCambridge · HVAC · Sheet metal · Active · #1488071
    5. Sep 4, 2026Mechanical (HVAC): RenovationCambridge · HVAC · Sheet metal · Active · #1483027
    6. Aug 10, 2026Mechanical (HVAC): RenovationCambridge · HVAC · Sheet metal · Active · #1476709
    7. Aug 3, 2026Upgrade old RTU with new RTU, same capacityAttleboro · HVAC · Sheet metal · Permit Issued · #M-26-1236
    8. Jul 30, 2026Install (1) 12,000 BTU Heat Pump in vestibuleAttleboro · HVAC · Sheet metal · Final Inspection · #M-26-1195
    9. Jun 22, 2026Mechanical (HVAC): ReplacementCambridge · HVAC · Sheet metal · Active · #1459470
    10. Jun 18, 2026Replace (1) Rooftop Unit with like unit. Disconnect and reconnect gas piping and line voltage. (GAS AND ELEC NEED TO BE Attleboro · HVAC · Sheet metal · Permit Issued · #M-26-0967
    11. Jun 10, 2026Add (1) 2ton Ductless SplitRefer PipingInsulationStart up and TestLexington · HVAC · Sheet metal · Permit Issued · #M-26-63
    12. May 26, 2026Adding new vav and new split systemFalmouth · HVAC · Sheet metal · Closed · #SH-26-1179

    Older permit history

    Filed more than 6 months ago. Shown for history; excluded from 6-month counts and rankings.

    1. May 1, 2026Mechanical (HVAC): Renovation (older)Cambridge · HVAC · Sheet metal · Active · #1449495
    2. Apr 30, 2026Mechanical (HVAC): Renovation (older)Cambridge · HVAC · Sheet metal · Complete · #1449150
    3. Mar 27, 2026Installing vrf heat recovery system with 3 ducted air handlers and fully ducted returns. provide an erv system and one e (older)Mansfield · HVAC · Sheet metal · Complete · #MEC-26-0180
    4. Apr 16, 2026- Rework (1) 8" duct run out to accomodate a new  floor plan- Duct cover insulation- Air balancing- 6' duct" (older)Lexington · HVAC · Sheet metal · Permit Issued · #S-26-36
    5. Mar 26, 2026MECHANICAL DEMOThis work shall include the make safe and demo of selective duct runs, hot water runouts, misc. controls (older)Lexington · HVAC · Sheet metal · Permit Issued · #M-26-35
    6. Feb 22, 2026One (1) rooftop package MUA with: o DX cooling o Modulating gas preheat o Energy recovery coil o MERV-8 & MERV-13 filtra (older)Lexington · HVAC · Sheet metal · Permit Issued · #M-26-21
    7. Jan 24, 2026Demo Permit ApplicationDisconnect existing RGDs in office area and saveDemo supply and exhaust duct from lab area servin (older)Lexington · HVAC · Sheet metal · Permit Issued · #M-26-13
    8. Jan 12, 2026MFG Suite #1Install Accuspec lab exhaust valveModify existing supply and exhaust duct systems to provide drops for the c (older)Lexington · HVAC · Sheet metal · Permit Issued · #S-26-2
    9. Jan 5, 2026Fabrication and installation of duct systems necessary to provide exhaust in the spaceProvide and install new RGDsAir ba (older)Lexington · HVAC · Sheet metal · Permit Issued · #S-25-195
    10. Jan 5, 2026MFG Suite #1Install Accuspec lab exhaust valveModify existing supply and exhaust duct systems to provide drops for the c (older)Lexington · HVAC · Sheet metal · Permit Issued · #M-25-175
    11. May 4, 2026Install new outdoor air unit ground level. Install 4 new heat pumps. Cut, cap, and make safe old hvac units. Rework of c (older)Attleboro · HVAC · Sheet metal · Final Inspection · #M-26-0669

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Massachusetts license lookup.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 12, 2026.