Directory / Cumberland / HVAC
Gm Perron & Son Inc
18 permits across 12 towns in the last 6 months
HVAC
Business contact from Woonsocket OpenGov record (signed-in), checked Nov 13, 2026. Not from permit records.
Activity by month
Permits filed each month. The first and last months are partial.
Where they’re working
Permits filed under this contractor by state and town, last 6 months.
Rhode Island 18
Types of projects
By place, trade and period
| Town / city | State | Trade | Last 90 days | Last 6 months | All documented |
|---|---|---|---|---|---|
| Cumberland | RI | HVAC | 0 | 4 | 4 |
| Woonsocket | RI | HVAC | 2 | 3 | 3 |
| Coventry | RI | HVAC | 0 | 2 | 2 |
| North Kingstown | RI | HVAC | 1 | 1 | 1 |
| Smithfield | RI | HVAC | 1 | 1 | 1 |
| Burrillville | RI | HVAC | 0 | 1 | 1 |
| North Smithfield | RI | HVAC | 0 | 1 | 1 |
| Warwick | RI | HVAC | 0 | 1 | 1 |
| Lincoln | RI | HVAC | 0 | 1 | 1 |
| Westerly | RI | HVAC | 0 | 1 | 1 |
| Richmond | RI | HVAC | 0 | 1 | 1 |
| Narragansett | RI | HVAC | 0 | 1 | 1 |
Permit timeline
- Oct 5, 20261-9k head 1-12k head 1-20k outdoor condenserNorth Kingstown · HVAC · Sheet metal · 1 · #2611
- Sep 25, 2026INSTALL GAS PIPING FOR 2 FURNACES, HOT WATER HEATER, COOKING STOVE, FIRE PLACE, DRYER & FUTURE GRILL.Smithfield · HVAC · Sheet metal · 1 · #M-26-286
- Aug 28, 2026Install gas piping from the fist floor meter to the dryer Install gas piping from second floor meter to the dryerWoonsocket · HVAC · Sheet metal · Complete · #M-26-336
- Aug 27, 2026Retrim boilers to meet codeWoonsocket · HVAC · Sheet metal · Complete · #M-26-335
- Jul 29, 2026INSTALL GAS PIPING FOR 4 APARTMENTSWoonsocket · HVAC · Sheet metal · Complete · #M-26-297
- Jul 27, 2026INSTALL NEW GAS DEMAND BOILERBurrillville · HVAC · Sheet metal · Complete · #M-26-163
- Jul 24, 2026INSTALL 1 OIL FIRED FURNACECoventry · HVAC · Sheet metal · 1 · #M-26-367
- Jul 24, 2026INSTALL 1 OIL FIRED STEAM BOILER COMPLETE WITH NEW BOILERCumberland · HVAC · Sheet metal · 1 · #MP-26-344
- Jul 22, 2026MINI SPLIT HEAT PUMP SYSTEMNorth Smithfield · HVAC · Sheet metal · 1 · #M-26-119
- Jul 21, 2026Install Rinnai 199 high efficiency boiler, wall hung with indirect water heater and 7-zones of baseboard heatWarwick · HVAC · Sheet metal · 1 · #5489
- Jul 17, 2026INSTALL NEW DUCTLESS MINI SPLIT SYSTEMCumberland · HVAC · Sheet metal · Complete · #MP-26-334
- Jul 14, 2026REMOVE OLD BOILER - HANG NEW BOILERLincoln · HVAC · Sheet metal · Complete · #M-26-217
Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.
License
We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Rhode Island Contractors' Registration and Licensing Board.
Is this your business?
Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.
Sources
- Burrillville OpenGov portal · retrieved Nov 13, 2026
- Coventry OpenGov portal · retrieved Nov 13, 2026
- Cumberland OpenGov portal · retrieved Nov 13, 2026
- Lincoln OpenGov portal · retrieved Nov 13, 2026
- Narragansett OpenGov portal · retrieved Nov 13, 2026
- North Kingstown OpenGov portal · retrieved Nov 13, 2026
- North Smithfield OpenGov portal · retrieved Nov 13, 2026
- Richmond OpenGov portal · retrieved Nov 13, 2026
- Smithfield OpenGov portal · retrieved Nov 13, 2026
- Warwick OpenGov portal · retrieved Nov 13, 2026
- Westerly OpenGov portal · retrieved Nov 13, 2026
- Woonsocket OpenGov portal · retrieved Nov 13, 2026
Not verified: contact info, business address, insurance, reviews. Page built Nov 14, 2026.