Directory / Portsmouth / Electrical

First Light Electric

9 permits across 3 towns in the last 6 months

Electrical

9documented permits
9last 6 months
5last 90 days
3towns/cities
1state
6/7months active

    Business contact from Tiverton OpenGov record (signed-in), checked Nov 12, 2026. Not from permit records.

    Activity by month

    Permits filed each month. The first and last months are partial.

    May 2026: 11MayJun 2026: 22JunJul 2026: 0JulAug 2026: 11AugSep 2026: 33SepOct 2026: 11OctNov 2026: 11Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 6 months.

    Rhode Island 9

    Types of projects

    • Electrical · Electrical9

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 6 monthsAll documented
    PortsmouthRIElectrical355
    MiddletownRIElectrical133
    TivertonRIElectrical111

    Permit timeline

    1. Nov 9, 2026Install a 50amp feeder and sub panel out to remote garage. 50amp main breaker installed and ground rod driven. Wire 3 20Portsmouth · Electrical · Electrical · 1 · #E-26-583
    2. Oct 7, 20261) Replaced meter-base and panel. Kept at 100amp . New ground rods, bonding , CATV bridge. Riser up pole 1.25" schedulaePortsmouth · Electrical · Electrical · 1 · #E-26-514
    3. Sep 23, 2026Wire existing generator 18 kw with generator prefabbed cord. tie into existing transfer switch. run tstat wire to AC conPortsmouth · Electrical · Electrical · 1 · #E-26-473
    4. Sep 22, 2026Install two circuit to new septic controller. Wire air pump pit and septic pump and floats in second pitTiverton · Electrical · Electrical · 1 · #E-26-377
    5. Sep 1, 2026Install a 50amp circuit from panel Unit #2 with SER cable to outside Spa disconnect (GFCI) and then PVC under deck to hoMiddletown · Electrical · Electrical · 1 · #43704
    6. Aug 12, 2026Conversion of a laundry room into a bathroom. Laundry room moving over to a stack unit in a closet. Adding one 20amp cirMiddletown · Electrical · Electrical · 1 · #43578
    7. Jun 19, 2026Install a 50amp feeder and mount a sub panel in the garage for (two) 30amp Car charger EV receptacles below sub panel. (Portsmouth · Electrical · Electrical · 1 · #E-26-305
    8. Jun 11, 2026Install a 20amp and a 15 amp circuit from the main panel in the basement to the new septic controller. Tie in circuits aPortsmouth · Electrical · Electrical · 1 · #E-26-279
    9. May 17, 2026Replace outside meter-base and riser onle, along with SER to inside panel, (cable failed and temporary repaired ) . ReplMiddletown · Electrical · Electrical · Complete · #42943

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Rhode Island Contractors' Registration and Licensing Board.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 12, 2026.