Directory / Providence / HVAC

Felix Hvac & R Llc

33 permits across 4 towns in the last 6 months

HVAC

33documented permits
33last 6 months
14last 90 days
4towns/cities
1state
7/7months active

    Business contact from Warwick OpenGov record (signed-in), checked Nov 13, 2026. Not from permit records.

    Activity by month

    Permits filed each month. The first and last months are partial.

    May 2026: 22MayJun 2026: 44JunJul 2026: 55JulAug 2026: 1010AugSep 2026: 44SepOct 2026: 44OctNov 2026: 44Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 6 months.

    Rhode Island 33

    Types of projects

    • HVAC · Sheet metal33

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 6 monthsAll documented
    ProvidenceRIHVAC112626
    CranstonRIHVAC333
    WarwickRIHVAC033
    SmithfieldRIHVAC011

    Permit timeline

    1. Nov 12, 2026Install fourth heads and two condenser (mini splits) in the basement.Providence · HVAC · Sheet metal · 1 · #MECH-26-1360
    2. Nov 12, 2026Installation furnace 92% 80,000BTU and case coil 2 1/2 tons. R un line set, run all flexibles, run all ducwork insulatedProvidence · HVAC · Sheet metal · 1 · #MECH-26-1356
    3. Nov 8, 2026Installation of 2 case coil, 2 tons, 2 outside unit , run line set, run all flexibles, run all ductwork insulated, instaCranston · HVAC · Sheet metal · 1 · #156848
    4. Nov 8, 2026New construction- Installation furnace 92% 80,000BTU and case coil 2 1/2 tons. R un line set, run all flexibles, run allProvidence · HVAC · Sheet metal · 1 · #MECH-26-1341
    5. Oct 21, 2026Installation of two furnace 92%. 80,000 BTW , two case coil(2 1/2 ton) and two outside unit to run the ductwork, flex anProvidence · HVAC · Sheet metal · 1 · #MECH-26-1256
    6. Oct 16, 2026New constrution- installation of furnace 92% 80,000 BTU 2 1/2 ton coil , run line set, ductwork , two zone damper for 1sProvidence · HVAC · Sheet metal · 1 · #MECH-26-1229
    7. Oct 16, 2026New constrution- installation of furnace 92% 80,000 BTU 2 1/2 ton coil , run line set, ductwork , two zone damper for 1sProvidence · HVAC · Sheet metal · 1 · #MECH-26-1228
    8. Oct 5, 2026New construction- Installation furnace 92% 80,000BTU and case coil 2 1/2 tons. R un line set, run all flexibles, run allProvidence · HVAC · Sheet metal · 1 · #MECH-26-1163
    9. Sep 28, 2026Installation of two furnace 92%. 80,000 BTW , two case coil(2 1/2 ton) and two outside unit to run the ductwork, flex anProvidence · HVAC · Sheet metal · 1 · #MECH-26-1142
    10. Sep 14, 2026Instalacion of mini split 10 head run the linse set to conect 3 out side condenceProvidence · HVAC · Sheet metal · 1 · #MECH-26-1088
    11. Sep 10, 2026Installation of 3 units (furnaces on cases coils), 3 condenser, run all ductworks, line sets, Drain piping, all flexibleProvidence · HVAC · Sheet metal · 1 · #MECH-26-1069
    12. Sep 2, 2026Installation of two furnace 92%. 80,000 BTW , two case coil(2 1/2 ton) and two outside unit to run the ductwork, flex anProvidence · HVAC · Sheet metal · 1 · #MECH-26-1041

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Rhode Island Contractors' Registration and Licensing Board.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 13, 2026.