Emmanuel Logakis
25 permits across 1 town in the last 12 months
Solar · State license verified
25permits, last 12 months
13permits, last 90 days
1town with permits
6/13months with activity
Activity by month
Permits filed each month. The first and last months are partial.
Where they’re working
Towns where permits were filed under this name, last 12 months.
Types of projects
By town and trade
| Town | Trade | Last 90 days | Last 12 months |
|---|---|---|---|
| Bourne | Solar | 13 | 25 |
Permit timeline
- Sep 23, 2026Solar: Installation of roof mounted photovoltaic solar systems, 14 panels 5.74kW. NO structural work needed at siteENERGBourne · Solar · Repair / alteration · Permit Issued · #EXB-26-515
- Sep 16, 2026Solar: Installation of roof mounted photovoltaic solar systems, 7 panels 2.87kW **ADD ON SYSTEM** NO structural work neeBourne · Solar · Repair / alteration · Permit Issued · #EXB-26-501
- Sep 16, 2026Solar: Installation of roof mounted photovoltaic solar systems, 40 panels 16.4kW. NO structural work needed at siteENERGBourne · Solar · Repair / alteration · Permit Issued · #EXB-26-499
- Sep 16, 2026Solar: Installation of roof mounted photovoltaic solar systems, 19 panels 7.79kW. NO ESS - NO structural work needed at Bourne · Solar · Repair / alteration · Permit Issued · #EXB-26-498
- Sep 8, 2026Solar: Installation of roof mounted photovoltaic solar systems, 12 panels 4.92kW. NO ESS - NO structural work needed at Bourne · Solar · Repair / alteration · Permit Issued · #EXB-26-472
- Sep 2, 2026Solar: Installation of roof mounted photovoltaic solar systems, 20 panels 8.2kW. NO structural work needed at siteENERGYBourne · Solar · Repair / alteration · Permit Issued · #EXB-26-460
- Sep 2, 2026Solar: Installation of roof mounted photovoltaic solar systems, 25 panels 10.25kW. NO structural work needed at siteENERBourne · Solar · Repair / alteration · Permit Issued · #EXB-26-456
- Sep 1, 2026Solar: Installation of roof mounted photovoltaic solar systems, 13 panels 5.33kW. NO ESS - NO structural work needed at Bourne · Solar · Repair / alteration · Permit Issued · #EXB-26-454
- Aug 28, 2026Solar: Installation of roof mounted photovoltaic solar systems, 8 panels 3.28kW. NO structural work needed at siteENERGYBourne · Solar · Repair / alteration · Permit Issued · #EXB-26-446
- Aug 17, 2026Solar: Installation of roof mounted photovoltaic solar systems, 10 panels 4.1kW. NO structural work needed at site(1) TEBourne · Solar · Repair / alteration · Active · #EXB-26-417
- Aug 11, 2026Solar: Installation of roof mounted photovoltaic solar systems, 14 panels 5.74kW. NO ESS - NO structural work needed at Bourne · Solar · Repair / alteration · Active · #EXB-26-401
- Aug 10, 2026Solar: Installation of roof mounted photovoltaic solar systems, 6 panels 2.46kW **ADD ON SYSTEM** NO structural work neeBourne · Solar · Repair / alteration · Permit Issued · #EXB-26-398
Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.
License
- Construction Supervisor CS-116126 · ActiveMA OPSI · checked Nov 4, 2026 · source
Is this your business?
Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and a contact form. Your permit activity is shown the same way either way.
Sources
- Town of Bourne monthly Past Permits reports · retrieved Nov 4, 2026
- MA OPSI License Verification
Not verified: contact info, business address, insurance, reviews. Page built Nov 4, 2026.