Directory / Providence / Electrical

East Bay Power Llc

9 permits across 6 towns in the last 6 months

Electrical

9documented permits
9last 6 months
5last 90 days
6towns/cities
1state
5/7months active

    Business contact from Providence OpenGov record (signed-in), checked Nov 13, 2026. Not from permit records.

    Activity by month

    Permits filed each month. The first and last months are partial.

    May 2026: 0MayJun 2026: 22JunJul 2026: 22JulAug 2026: 0AugSep 2026: 33SepOct 2026: 11OctNov 2026: 11Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 6 months.

    Rhode Island 9

    Types of projects

    • Electrical · Electrical9

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 6 monthsAll documented
    ProvidenceRIElectrical033
    BristolRIElectrical222
    ScituateRIElectrical111
    North KingstownRIElectrical111
    NewportRIElectrical111
    South KingstownRIElectrical011

    Permit timeline

    1. Nov 2, 2026Install a 120/240v 100 amp temp service on a stanchion.Scituate · Electrical · Electrical · 1 · #E-26-202
    2. Oct 1, 2026Install a new underground 320amp 120/240v single phase service. Install new 320amp meter with two 200 amp mains. Refeed North Kingstown · Electrical · Electrical · Complete · #2582
    3. Sep 22, 2026Provide electrical work associated with the Newport Art Museum HVAC upgrade, including new 480V, 3-phase power feeds andNewport · Electrical · Electrical · Complete · #E-26-629
    4. Sep 9, 2026Electrical renovation for conversion of existing school to apartments, including electrical service/distribution, branchBristol · Electrical · Electrical · 1 · #E-26-325
    5. Sep 9, 2026Install a 200 amp overhead temp service.Bristol · Electrical · Electrical · 1 · #E-26-324
    6. Jul 21, 2026Replace existing lights in the auditorium with new lights.Providence · Electrical · Electrical · Complete · #ELEC-26-1321
    7. Jul 17, 2026Furnish and install site lighting power and lighting.South Kingstown · Electrical · Electrical · 1 · #94304
    8. Jun 25, 2026RISD 2nd floor EFS Studio: Rework fire alarm device to accomodate new wall layout. Install 4 new smoke detectors and 5 nProvidence · Electrical · Electrical · Complete · #FRAL-26-125
    9. Jun 24, 2026RISD - 2nd Floor EFS Studio: Rework existing lighting to accomodate new wall layout. Install a new 120/208 3phase 60 ampProvidence · Electrical · Electrical · Complete · #ELEC-26-1134

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Rhode Island Contractors' Registration and Licensing Board.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 15, 2026.