Ct Permit Services - Neeva Delapaz
4 permits across 1 town in the last 6 months
HVAC
Business contact from Wilton OpenGov record (signed-in), checked Nov 13, 2026. Not from permit records.
Activity by month
Permits filed each month. The first and last months are partial.
Where they’re working
Permits filed under this contractor by state and town, last 6 months.
Connecticut 4
Types of projects
By place, trade and period
Permit timeline
- Oct 9, 2026Set (1) 60gal LP tank A/G and run 65ft of CSST piping to stove from tankWilton · HVAC · Sheet metal · Complete · #SITE-26-194
- Oct 7, 2026ADD (1) 120-GALLON AG LP TANK TO EXISTING LP TANK SYSTEM AND RUN APPROX. 10' FROM TANKS TO GENERATOR/ RANGE (BY OTHERS)Wilton · HVAC · Sheet metal · 1 · #SITE-26-191
- Jun 23, 2026Install (1) 18kw generator, set (2) 120-gallon AG LPT tanks and run 20' 5/8" copper line from tanks to generator.Wilton · HVAC · Sheet metal · Complete · #SITE-26-107
- Jun 1, 2026Install (2) 120-gallon AG LP tanks and run 20' 3/4" plastic line in trench to existing generator.Wilton · HVAC · Sheet metal · Complete · #SITE-26-94
Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.
License
We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Connecticut eLicense (Department of Consumer Protection) license lookup.
Is this your business?
Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.
Sources
- Wilton OpenGov portal · retrieved Nov 13, 2026
Not verified: contact info, business address, insurance, reviews. Page built Nov 14, 2026.