Directory / Westerly / HVAC

Comfort Zone Inc

8 permits across 2 towns in the last 6 months

HVAC

8documented permits
8last 6 months
4last 90 days
2towns/cities
1state
5/7months active

    Business contact from Westerly OpenGov record (signed-in), checked Nov 12, 2026. Not from permit records.

    Activity by month

    Permits filed each month. The first and last months are partial.

    May 2026: 11MayJun 2026: 11JunJul 2026: 0JulAug 2026: 33AugSep 2026: 11SepOct 2026: 22OctNov 2026: 0Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 6 months.

    Rhode Island 8

    Types of projects

    • HVAC · Sheet metal8

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 6 monthsAll documented
    WesterlyRIHVAC355
    NarragansettRIHVAC133

    Permit timeline

    1. Oct 21, 2026Indoor Unit: (1) 15,000BTU wall mount MSZ-FX15NL -(1) line set, condensate tubing, communication wire and miscellaneous Westerly · HVAC · Sheet metal · 1 · #M-26-480
    2. Oct 8, 2026The installation of a 4 zone, (7.5 ton) Geothermal closed loop system using the following equipment: All equipment to beWesterly · HVAC · Sheet metal · 1 · #M-26-450
    3. Sep 17, 2026To install a 9 zone (15 Ton) LPgas heated hydronic / heat pump system using the following equipment: (8) Mitsubishi 2-ToWesterly · HVAC · Sheet metal · 1 · #M-26-422
    4. Aug 19, 2026Install a Mitsubishi ducted heat pump system using the following equipment First Floor Office: Mitsubishi 1 Ton Air HandNarragansett · HVAC · Sheet metal · 1 · #M-26-374
    5. Aug 13, 2026To install a(2) 1 zone heat/ac hydro air system using the following equipment: First Floor: (1) First Company 18HCXW hydNarragansett · HVAC · Sheet metal · 1 · #M-26-360
    6. Aug 3, 2026To install a 4 Zone Mitsubishi ducted heat/ac system using the following equipment: First floor: Mitsubishi 3 Ton indoorWesterly · HVAC · Sheet metal · 1 · #M-26-352
    7. Jun 3, 2026To install a 4 zone LP gas heat/ac system using the following equipment: Basement: (1) Mitsubishi Ducted 2-Ton Air HandlWesterly · HVAC · Sheet metal · 1 · #M-26-252
    8. May 15, 2026Gas Furnace & AC System To install (2) 1 zone gas heat/ac system using the following equipment: First floor equipment inNarragansett · HVAC · Sheet metal · 1 · #M-26-196

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Rhode Island Contractors' Registration and Licensing Board.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 13, 2026.