Business contact from Bristol OpenGov record (signed-in), checked Nov 13, 2026. Not from permit records.
Activity by month
Permits filed each month. The first and last months are partial.
Where they’re working
Permits filed under this contractor by state and town, last 6 months.
Connecticut 3
Types of projects
By place, trade and period
| Town / city | State | Trade | Last 90 days | Last 6 months | All documented |
|---|---|---|---|---|---|
| Bristol | CT | Building | 2 | 2 | 2 |
| Bristol | CT | Windows & doors | 1 | 1 | 1 |
Permit timeline
- Nov 10, 2026Construction of Two 2 hour partion walls to create an exterior passthroughBristol · Building · Residential · 1 · #B-26-3027
- Oct 30, 2026Permit to re use existing office as a bedroom. The home is currently equipped with a full fire alarm and fire sprinkler Bristol · Windows & doors · Residential · 1 · #B-26-2801
- Sep 8, 2026Scope of Work: Interior renovation to include a kitchen remodel, bathroom remodel with reconfiguration of the layout, miBristol · Building · Residential · 1 · #B-26-1716
Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.
License
We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Connecticut eLicense (Department of Consumer Protection) license lookup.
Is this your business?
Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.
Sources
- Bristol OpenGov portal · retrieved Nov 13, 2026
Not verified: contact info, business address, insurance, reviews. Page built Nov 14, 2026.