Directory / Tiverton / Plumbing

Coastline Plumbing & Mechanical Llc

18 permits across 7 towns in the last 6 months

Plumbing · HVAC

18documented permits
18last 6 months
7last 90 days
7towns/cities
1state
6/7months active

    Business contact from South Kingstown OpenGov record (signed-in), checked Nov 13, 2026. Not from permit records.

    Activity by month

    Permits filed each month. The first and last months are partial.

    May 2026: 11MayJun 2026: 33JunJul 2026: 22JulAug 2026: 66AugSep 2026: 55SepOct 2026: 11OctNov 2026: 0Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 6 months.

    Rhode Island 18

    Types of projects

    • Plumbing · Plumbing10
    • HVAC · Sheet metal8

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 6 monthsAll documented
    TivertonRIPlumbing255
    Little ComptonRIHVAC133
    TivertonRIHVAC233
    Little ComptonRIPlumbing122
    BristolRIHVAC111
    BarringtonRIHVAC011
    NewportRIPlumbing011
    South KingstownRIPlumbing011
    PortsmouthRIPlumbing011

    Permit timeline

    1. Oct 25, 2026Rough and finished nine unit building Each apartment consists of two bathrooms, one kitchen, one washing machine connectTiverton · Plumbing · Plumbing · 1 · #P-26-195
    2. Sep 27, 2026Gas pipe following 2- furnaces, 1- water heater, 1- stoveBristol · HVAC · Sheet metal · 1 · #M-26-296
    3. Sep 22, 2026Fixture replacement 2-1/2 baths, one kitchen sink, one dishwasher No gasTiverton · Plumbing · Plumbing · 1 · #P-26-164
    4. Sep 9, 2026Stove replacementLittle Compton · HVAC · Sheet metal · 1 · #M-26-125
    5. Sep 9, 2026Kitchen sink replacementLittle Compton · Plumbing · Plumbing · 1 · #P-26-57
    6. Sep 8, 2026Gas pipe one furnaceTiverton · HVAC · Sheet metal · Complete · #M-26-303
    7. Aug 21, 2026Gas pipe 2- furnace 1- water heater 1- stove 1- dryerTiverton · HVAC · Sheet metal · 1 · #M-26-281
    8. Aug 12, 2026Install two furnaces, one in the basement and one in the atticBarrington · HVAC · Sheet metal · Complete · #M-26-237
    9. Aug 11, 2026Gas pipe one furnaceTiverton · HVAC · Sheet metal · 1 · #M-26-264
    10. Aug 4, 2026Rough and finish a duplex First floor- four toilets, six lavs, two tubs, two washing machine connections, two kitchen siTiverton · Plumbing · Plumbing · 1 · #P-26-126
    11. Aug 4, 2026Rough & Finish 2-1/2 baths, 1- kitchen 1- dishwasher, 1- wash machine connection, 2- hose bibs, 1- electric water heaterNewport · Plumbing · Plumbing · 1 · #P-26-239
    12. Aug 2, 2026Rough & finish triplex 6- toilets,6- tubs, 9- lavs,3- wash machine connection,3- kitchen sink,3- dish washer 3- electricTiverton · Plumbing · Plumbing · 1 · #P-26-122

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Rhode Island Contractors' Registration and Licensing Board.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 15, 2026.