Directory / Boston / Building

Chris Ferragamo

44 permits across 1 town in the last 12 months

Building · HVAC

44documented permits
44last 12 months
10last 90 days
1town/city
1state
12/13months active

    We haven’t confirmed public business contact details for this contractor yet. You can still request a quote and we’ll pass it along once we reach them.

    Activity by month

    Permits filed each month. The first and last months are partial.

    Nov 2025: 33NovDec 2025: 66DecJan 2026: 22JanFeb 2026: 33FebMar 2026: 33MarApr 2026: 44AprMay 2026: 33MayJun 2026: 44JunJul 2026: 55JulAug 2026: 55AugSep 2026: 11SepOct 2026: 55OctNov 2026: 0Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 12 months.

    Massachusetts 44

    Types of projects

    • Building · Commercial42
    • HVAC · Commercial2

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 12 monthsAll documented
    BostonMABuilding104242
    BostonMAHVAC022

    Permit timeline

    1. Oct 28, 2026Renovation (fast track): 4th Floor work to consist of interior office renovations. architectural upgrades to conference Boston · Building · Commercial · Open · #ALT1905626
    2. Oct 28, 2026Interior renovation: 38th Floor- new partitions, doors, floor covering, paint, ceiling tiles throughout. Mechanical and Boston · Building · Commercial · Open · #SF1911482
    3. Oct 26, 2026Interior renovation: Turning up (9) sprinkler heads- ALT1905626Boston · Building · Commercial · Open · #SF1912638
    4. Oct 19, 2026Interior renovation: 680 Atlantic Ave- Architectural work to be done on the elevator landings for floors 21 and 22. No MBoston · Building · Commercial · Open · #SF1909910
    5. Oct 1, 2026Interior renovation: 4th floor. Removing partitions and fixtures throughout the space including electrical, flooring, drBoston · Building · Commercial · Open · #SF1904902
    6. Sep 10, 2026Renovation (fast track): Scope is for the 26th Floor interior office renovation. New flooring, ceiling, wall covering anBoston · Building · Commercial · Open · #ALT1887809
    7. Aug 17, 2026Renovation (fast track): scope of work is for the first floor fit out of a lobby cafe. Work is to consist of architecturBoston · Building · Commercial · Open · #ALT1875355
    8. Aug 17, 2026Renovation (fast track): 111 Huntington Avenue- 7th Floor Common corridor architectural and M/E/FP/FA upgradesBoston · Building · Commercial · Open · #ALT1881838
    9. Aug 14, 2026Renovation (fast track): Work will be on the 7th and 8th floors and scope will include removing non load-bearing walls, Boston · Building · Commercial · Open · #ALT1883243
    10. Aug 14, 2026Interior renovation: Scope of work is to be done at 680 Atlantic avenue on floors P1-P3. Scope of work includes additionBoston · Building · Commercial · Open · #SF1886144
    11. Aug 4, 2026Interior renovation: Work is to be done on the 7th floor and consists of minor interior renovations including repairing Boston · Building · Commercial · Open · #SF1878668
    12. Jul 31, 2026Renovation (fast track): Work is to be done on the 11th floor and consist of an interior renovation of common corridors Boston · Building · Commercial · Closed · #ALT1861230

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Massachusetts license lookup.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 6, 2026.