Directory / Bridgeport / Electrical

C Ward Electric

27 permits across 4 towns in the last 6 months

Electrical · Solar · Building

27documented permits
27last 6 months
10last 90 days
4towns/cities
1state
7/7months active

    Business contact from Bridgeport EnerGov permit-detail contacts (CT), checked Nov 5, 2026. Not from permit records.

    Activity by month

    Permits filed each month. The first and last months are partial.

    May 2026: 11MayJun 2026: 88JunJul 2026: 44JulAug 2026: 55AugSep 2026: 44SepOct 2026: 33OctNov 2026: 22Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 6 months.

    Connecticut 27

    Types of projects

    • Electrical · Electrical - General11
    • Solar · Electrical - Solar7
    • Solar · Residential2
    • Solar · Residential PV Installation - Roof Mount2
    • Electrical · Residential Electrical Service Change Permit Application1
    • Building · Residential1

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 6 monthsAll documented
    BridgeportCTElectrical31111
    BridgeportCTSolar277
    BristolCTSolar222
    ManchesterCTElectrical122
    ManchesterCTSolar122
    BristolCTBuilding111
    MeridenCTSolar011
    BridgeportCTBuilding011

    Permit timeline

    1. Nov 5, 2026GeneralBridgeport · Electrical · Electrical - General · Fees Due · #ELECTRICAL-026749-2026
    2. Nov 2, 2026Remove and reinstall solar system in same loaction.Bristol · Solar · Residential · 1 · #B-26-2841
    3. Oct 22, 2026GeneralBridgeport · Electrical · Electrical - General · Reviewed Requires Corrections / Additional Info · #ELECTRICAL-026540-2026
    4. Oct 12, 2026200 amp service upgrade to include the following: New 200 amp meter socket New 200 amp rated riser New 200 amp main breaManchester · Electrical · Residential Electrical Service Change Permit Application · Issued · #ER-019834-2026
    5. Oct 1, 2026GeneralBridgeport · Electrical · Electrical - General · Reviewed Requires Corrections / Additional Info · #ELECTRICAL-026132-2026
    6. Sep 24, 2026Installation of new roof mounted 5.16 Kw pv systemBristol · Solar · Residential · 1 · #B-26-2060
    7. Sep 8, 2026SolarBridgeport · Solar · Electrical - Solar · Issued · #ELECTRICAL-025753-2026
    8. Sep 1, 2026Removal of existing PV System. PV system will not be re-installed by C Ward. All material will be disposed of and electrManchester · Solar · Residential PV Installation - Roof Mount · Closed · #ER-019305-2026
    9. Sep 1, 2026Removal and reinstall 45 panels in same locationBristol · Building · Residential · Complete · #B-26-1592
    10. Aug 24, 2026SolarBridgeport · Solar · Electrical - Solar · Issued · #ELECTRICAL-025531-2026
    11. Aug 7, 2026SolarBridgeport · Solar · Electrical - Solar · Issued · #ELECTRICAL-025296-2026
    12. Aug 7, 2026SolarBridgeport · Solar · Electrical - Solar · Complete · #ELECTRICAL-025295-2026

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Connecticut eLicense (Department of Consumer Protection) license lookup.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 15, 2026.