Directory / Gloucester / HVAC

Bledar Pilla

14 permits across 1 town in the last 12 months

HVAC

14documented permits
14last 12 months
7last 90 days
1town/city
1state
7/13months active

    We haven’t confirmed public business contact details for this contractor yet. You can still request a quote and we’ll pass it along once we reach them.

    Activity by month

    Permits filed each month. The first and last months are partial.

    Nov 2025: 0NovDec 2025: 0DecJan 2026: 0JanFeb 2026: 0FebMar 2026: 0MarApr 2026: 0AprMay 2026: 11MayJun 2026: 22JunJul 2026: 33JulAug 2026: 33AugSep 2026: 11SepOct 2026: 33OctNov 2026: 11Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 12 months.

    Massachusetts 14

    Types of projects

    • HVAC · Sheet metal14

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 12 monthsAll documented
    GloucesterMAHVAC71414

    Permit timeline

    1. Nov 2, 2026Mechanical Permit: Replacing Three LG het pump systems, Five new six new air handlers, and three outdoor units.  All ducGloucester · HVAC · Sheet metal · Active · #MECH-26-108
    2. Oct 22, 2026Mechanical Permit: Installing a two zone Mitsubishi Hyper Heat System, two wall units with a 24K BTU Outdoor unit.Gloucester · HVAC · Sheet metal · Active · #MECH-26-104
    3. Oct 6, 2026Mechanical Permit: Installing a Two Zone Lennox Heat Pump System for Upper Floor of Home, 18 SEER Variable Stage System,Gloucester · HVAC · Sheet metal · Active · #MECH-26-96
    4. Oct 2, 2026Mechanical Permit: Replacing a two Zone Mitsubishi System installing a 20K BTU Hyper Heat outdoor unit with two wall uniGloucester · HVAC · Sheet metal · Active · #MECH-26-95
    5. Sep 24, 2026Mechanical Permit: Replacing 80% gas furnace in crawl space, all ductwork to stay in place.Gloucester · HVAC · Sheet metal · Active · #MECH-26-93
    6. Aug 20, 2026Mechanical Permit: Installing a three zone wall mounted Mitsubishi hyper heat system.Gloucester · HVAC · Sheet metal · Active · #MECH-26-82
    7. Aug 14, 2026Mechanical Permit: Replacing gas furnace only, with Lennox 2 stage 80% furnace, ac and ductwork to stay in place.Gloucester · HVAC · Sheet metal · Active · #MECH-26-80
    8. Aug 4, 2026Mechanical Permit: Replacing a two zone Mitsubishi Heat Pump System, Two Wall units, and one outdoor unit.Gloucester · HVAC · Sheet metal · Active · #MECH-26-74
    9. Jul 21, 2026Mechanical Permit: Installing a three Zone Mitsubishi 30K BTU hyper heat pump, with three wall units.Gloucester · HVAC · Sheet metal · Active · #MECH-26-70
    10. Jul 15, 2026Mechanical Permit: Repalcing coil and condenser for ac system, furnace and ductwork to stay in place.Gloucester · HVAC · Sheet metal · Active · #MECH-26-67
    11. Jul 8, 2026Mechanical Permit: Replacing existing heat pump system with lennox 18 SEER heat pump, duct work to stay in place.Gloucester · HVAC · Sheet metal · Active · #MECH-26-63
    12. Jun 10, 2026Mechanical Permit: Replacing AC system with Lennox Variable Stage 18 SEER heat pump for supplemental heat, duct work to Gloucester · HVAC · Sheet metal · Active · #MECH-26-51

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Massachusetts license lookup.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 6, 2026.