Base Power

Electrician in Austin, TX

Base Power has been trusted on 826 permits across 1 town in the last 6 months

Electrical · Solar

Active in Austin in the last 90 days

Trusted by homeowners in Austin

Rankings as of Nov 21, 2026

Request a quote

832documented permits
826last 6 months
582last 90 days
1town/city
1state
6/7months active

Activity by month

Permits filed each month. The first and last months are partial.

May 2026: 0MayJun 2026: 11JunJul 2026: 4343JulAug 2026: 248248AugSep 2026: 170170SepOct 2026: 298298OctNov 2026: 6666Nov

Where they’re working

Permits filed under this contractor by state and town, last 6 months.

Texas 826

Types of projects

  • Electrical · Electrical825
  • Solar · Electrical1

Location and projects

Documented permits by town. Pins sit at each town’s center, not at job addresses.

Loading map…

By place, trade and period

Town / cityStateTradeLast 90 daysLast 6 monthsAll documented
AustinTXElectrical581825831
AustinTXSolar111

Recent permits

Permit timeline: the most recent permits filed under this contractor in the last 6 months, newest first. Job values are shown only when the town record lists one.

  1. Nov 8, 2026Electrical Permit: Auxiliary Power: BASE: Installing a backup battery system and additional meter socket.Austin · Electrical · Electrical · Active · #2026-147345 EP
  2. Nov 8, 2026Electrical Permit: Auxiliary Power: BASE: Installing a backup battery system and additional meter socket.Austin · Electrical · Electrical · Active · #2026-147391 EP
  3. Nov 8, 2026Electrical Permit: Auxiliary Power: BASE: Installing a backup battery system and additional meter socket.Austin · Electrical · Electrical · Active · #2026-147469 EP
  4. Nov 8, 2026Electrical Permit: Auxiliary Power: BASE: Installing a backup battery system and additional meter socket.Austin · Electrical · Electrical · Active · #2026-147518 EP
  5. Nov 5, 2026Electrical Permit: Auxiliary Power: BASE: Installing a backup battery system and additional meter socket.Austin · Electrical · Electrical · Active · #2026-146729 EP
  6. Nov 5, 2026Electrical Permit: Auxiliary Power: BASE: Installing a backup battery system and additional meter socket.Austin · Electrical · Electrical · Active · #2026-146967 EP
  7. Nov 5, 2026Electrical Permit: Auxiliary Power: BASE: Installing a backup battery system and additional meter socket.Austin · Electrical · Electrical · Active · #2026-146979 EP
  8. Nov 5, 2026Electrical Permit: Auxiliary Power: BASE: Installing a backup battery system and additional meter socket.Austin · Electrical · Electrical · Active · #2026-146988 EP
  9. Nov 4, 2026Electrical Permit: Auxiliary Power: BASE: Installing a backup battery system and additional meter socket.Austin · Electrical · Electrical · Active · #2026-146178 EP
  10. Nov 4, 2026Electrical Permit: Auxiliary Power: BASE: Installing a backup battery system and additional meter socket.Austin · Electrical · Electrical · Active · #2026-146434 EP
  11. Nov 4, 2026Electrical Permit: Auxiliary Power: BASE: Installing a backup battery system and additional meter socket.Austin · Electrical · Electrical · Active · #2026-146449 EP
  12. Nov 4, 2026Electrical Permit: Auxiliary Power: BASE: Installing a backup battery system and additional meter socket.Austin · Electrical · Electrical · Active · #2026-146461 EP

Older permit history

Filed more than 6 months ago. Shown for history; excluded from 6-month counts and rankings.

  1. May 19, 2026Electrical Permit: Repair: Updated: meter pull to cut power requiring only the temporary pull of the meter itself. There (older)Austin · Electrical · Electrical · Final · #2026-063987 EP
  2. Apr 19, 2026Electrical Permit: Auxiliary Power: Backup battery system along with new main service disconnect. No updates to utility (older)Austin · Electrical · Electrical · Final · #2026-048492 EP
  3. Apr 17, 2026Electrical Permit: Auxiliary Power: Backup battery system that backs up home along with new main service disconnect. No (older)Austin · Electrical · Electrical · Final · #2026-047904 EP
  4. Apr 8, 2026Electrical Permit: Auxiliary Power: Backup battery system along with new main service disconnect. No updates to utility (older)Austin · Electrical · Electrical · Final · #2026-043420 EP
  5. Apr 8, 2026Electrical Permit: Auxiliary Power: We want to install a Battery at this residence. We will be installing downstream of (older)Austin · Electrical · Electrical · Final · #2026-043154 EP
  6. Apr 5, 2026Electrical Permit: Auxiliary Power: Backup battery system along with new main service disconnect. No updates to utility (older)Austin · Electrical · Electrical · Final · #2026-041437 EP

Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

License

We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Texas Department of Licensing and Regulation (TDLR) license search.

Is this your business?

Claim this profile for free to correct details and share it. Get Verified Pro. Show homeowners a complete, professional profile: your logo, job photos, and a short story they can trust. $9/mo or $99/yr, save $9. Your phone number and quote button stay free. Your permit counts and rank stay the same either way.

Claim it free Get Verified Pro: $9/mo Get Verified Pro: $99/yr Get website badge

Sources

Not verified: contact info, business address, insurance, reviews. Page built Nov 21, 2026.