Directory / Bridgewater / Electrical

Anthony Zucco

19 permits across 1 town in the last 12 months

Electrical

19documented permits
19last 12 months
3last 90 days
1town/city
1state
9/13months active

    We haven’t confirmed public business contact details for this contractor yet. You can still request a quote and we’ll pass it along once we reach them.

    Activity by month

    Permits filed each month. The first and last months are partial.

    Nov 2025: 33NovDec 2025: 22DecJan 2026: 0JanFeb 2026: 0FebMar 2026: 44MarApr 2026: 11AprMay 2026: 33MayJun 2026: 11JunJul 2026: 22JulAug 2026: 0AugSep 2026: 22SepOct 2026: 11OctNov 2026: 0Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 12 months.

    Massachusetts 19

    Types of projects

    • Electrical · Electrical19

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 12 monthsAll documented
    BridgewaterMAElectrical31919

    Permit timeline

    1. Oct 26, 2026UPGRADE ELECTRICAL SERVICE FROM 100AMP TO 200AMPBridgewater · Electrical · Electrical · Ready For Payment
    2. Sep 15, 2026INSTALL A 20KW PROPANE POWERED KOHLER GENERATOR AND 100AMP AUTOMATIC TRANSFER SWITCHBridgewater · Electrical · Electrical · Complete
    3. Sep 1, 2026INSTALL A 14KW NATURAL GAS KOHLER GENERATOR WIRED TO A 100AMP AUTOMATIC TRANSFER SWITCHBridgewater · Electrical · Electrical · Permit Issued
    4. Jul 8, 2026INSTALL (2) DEDICATED 20A CIRCUITS, AND (2) DOUBLE DUPLEX RECEPTACLES. (1) ON THE FRONT EXTERIOR OF DWELLING AND (1) IN Bridgewater · Electrical · Electrical · Complete
    5. Jul 8, 2026WIRE PFAS AND GREEN SAND PAD PER ENGINEER DRAWINGSBridgewater · Electrical · Electrical · Complete
    6. Jun 15, 2026PROVIDE UNDERGRIOUND PIPING FROM THE PUMP STATION BUILDING TO THE PFAS PAD, AND FROM THE PFAS PAD TO THE GREENSAND FILTEBridgewater · Electrical · Electrical · Complete
    7. May 29, 2026INSTALL UFER GROUND FOR PFAS PADBridgewater · Electrical · Electrical · Complete
    8. May 21, 2026REPLACE EXISITNG GENERATOR WITH NEW 100KW WIRED TO AN EXISTING AUTOMATIC TRANSFER SWITCHBridgewater · Electrical · Electrical · Complete
    9. May 5, 2026INSTALL A 20KW PROPANE POWERED KOHLER GENERATOR AND 200AMP AUTOMATIC TRANSFER SWITCHBridgewater · Electrical · Electrical · Permit Issued
    10. Apr 8, 2026Provide 60 amp underground to construction site trailerBridgewater · Electrical · Electrical · Complete
    11. Mar 27, 2026INSTALL A 20KW PROPANE POWERED KOHLER GENERATOR AND 200AMP AUTOMATIC TRANSFER SWITCHBridgewater · Electrical · Electrical · Permit Issued
    12. Mar 25, 2026INSTALL A 14KW NATURAL GAS POWERED KOHLER GENERATOR AND 200AMP AUTOMATIC TRANSFER SWITCHBridgewater · Electrical · Electrical · Permit Issued

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Massachusetts license lookup.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 6, 2026.