Directory / Boston / Building

Andy Kakish

24 permits across 1 town in the last 12 months

Building

24documented permits
24last 12 months
1last 90 days
1town/city
1state
8/13months active

    We haven’t confirmed public business contact details for this contractor yet. You can still request a quote and we’ll pass it along once we reach them.

    Activity by month

    Permits filed each month. The first and last months are partial.

    Nov 2025: 11NovDec 2025: 44DecJan 2026: 11JanFeb 2026: 0FebMar 2026: 66MarApr 2026: 55AprMay 2026: 33MayJun 2026: 33JunJul 2026: 0JulAug 2026: 0AugSep 2026: 11SepOct 2026: 0OctNov 2026: 0Nov

    Where they’re working

    Permits filed under this contractor by state and town, last 12 months.

    Massachusetts 24

    Types of projects

    • Building · Commercial24

    By place, trade and period

    Town / cityStateTradeLast 90 daysLast 12 monthsAll documented
    BostonMABuilding12424

    Permit timeline

    1. Sep 15, 2026Renovation (fast track): interior sprinkler head turnup per nfpa on partial 6th floor.Boston · Building · Commercial · Open · #ALT1897741
    2. Jun 18, 2026Interior renovation: Interior 10 floor lobby and corridor renovation. Work includes New finishes throughout (Flooring, CBoston · Building · Commercial · Open · #SF1862306
    3. Jun 17, 2026Renovation (fast track): Partial 7th floor interior demising renovation of an existing occupied space. Work includes minBoston · Building · Commercial · Closed · #ALT1855756
    4. Jun 9, 2026Renovation (fast track): Interior Lobby ADA lift replacement. Work includes replacement of old ADA Lift and new structurBoston · Building · Commercial · Open · #ALT1845337
    5. May 20, 2026Renovation (fast track): Partial 25th Floor interior spec suite office fit out. Work includes non structural gypsum boarBoston · Building · Commercial · Open · #ALT1840204
    6. May 19, 2026Renovation (fast track): Partial 37th floor interior office fit out. Work includes minor demolition, non structural metaBoston · Building · Commercial · Closed · #ALT1845322
    7. May 14, 2026Renovation (fast track): Partial 13th Floor interior renovation. Work includes non structural gypsum board partitions, oBoston · Building · Commercial · Closed · #ALT1845895
    8. Apr 29, 2026Renovation (fast track): 5th floor interior renovation. Work to include new renovations to existing offices, new gypsum Boston · Building · Commercial · Open · #ALT1826111
    9. Apr 9, 2026Renovation (fast track): Build interior walls with associated finishes to create future retail spaces and provide MEPFP Boston · Building · Commercial · Open · #ALT1823749
    10. Apr 9, 2026Interior renovation: Interior renovation to create future retail spaces and provide MEPFP infrastructure, work associateBoston · Building · Commercial · Closed · #SF1836905
    11. Apr 9, 2026Interior renovation: 4th floor renovation to include minor make safe and demo, update light fixtures, flooring and paintBoston · Building · Commercial · Open · #SF1836916
    12. Apr 1, 2026Renovation (fast track): Partial 1st Floor interior demolition. Work includes removal of gypsum partitions, and finishesBoston · Building · Commercial · Closed · #ALT1824391

    Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.

    License

    We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the Massachusetts license lookup.

    Is this your business?

    Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.

    Claim it free Upgrade for $9/mo Get website badge

    Sources

    Not verified: contact info, business address, insurance, reviews. Page built Nov 6, 2026.