We haven’t confirmed public business contact details for this contractor yet. You can still request a quote and we’ll pass it along once we reach them.
Activity by month
Permits filed each month. The first and last months are partial.
Where they’re working
Permits filed under this contractor by state and town, last 6 months.
New Hampshire 17
Types of projects
By place, trade and period
| Town / city | State | Trade | Last 90 days | Last 6 months | All documented |
|---|---|---|---|---|---|
| Rochester | NH | Site work | 2 | 11 | 11 |
| Portsmouth | NH | Building | 3 | 3 | 3 |
| Portsmouth | NH | Insulation | 2 | 2 | 2 |
| Portsmouth | NH | Site work | 0 | 1 | 1 |
Permit timeline
- Oct 12, 2026Remove damaged bathroom vanity as well as sheetrock wall affected by water.Rochester · Site work · DEMOLITION · 1 · #DEMO-26-42
- Sep 25, 2026Due to wate damage from a failed mixing valve we need to remove drywall and laminate flooring in the bathroom as well asRochester · Site work · DEMOLITION · 1 · #DEMO-26-38
- Sep 15, 2026Water damage mitigation - Remove affected plaster ceiling and affected drywall walls in cubicle areaPortsmouth · Building · Residential · 1 · #BLDG-26-685
- Sep 9, 2026Water damage mitigation. Removal of wet drywall ceiling and wall, removal of wet insulation, removal of wet hardwood floPortsmouth · Insulation · Residential · 1 · #BLDG-26-674
- Sep 8, 2026Water damage mitigation. Removal of affected carpet pad, insulation, and particle board wallsPortsmouth · Insulation · Residential · 1 · #BLDG-26-671
- Aug 26, 2026Water Damage Mitigation: Bathroom - Remove drywall and insulation from affected ceiling and walls - Remove tile flooringPortsmouth · Building · Residential · 1 · #BLDG-26-638
- Aug 26, 2026Interior non-structural demolition of interior finishes within 159 Austin Street, Unit #4 Project to Include: Remove affPortsmouth · Building · Residential · 1 · #BLDG-26-637
- Jul 21, 2026Demolition of affected drywall ceiling and drywall wall in kitchen as well as hardwood flooring. Demolition of affected Rochester · Site work · DEMOLITION · 1 · #DEMO-26-25
- Jul 8, 2026The demolition scope includes removal of affected drywall and insulation in the kitchen, removal of affected insulation Rochester · Site work · DEMOLITION · 1 · #DEMO-26-24
- Jul 8, 2026Removal of wet insulation from the underbelly . Removeal of wet flooring and swowllen particle board sub floor. Removal Rochester · Site work · DEMOLITION · 1 · #DEMO-26-23
- Jun 30, 2026Water mitigation. Removal of affected drywall, insulation, vinyl plank flooring, etc.Rochester · Site work · DEMOLITION · 1 · #DEMO-26-20
- Jun 17, 20262nd Level - Remove affected carpets and drywall in bedrooms, remove tile floor and drywall in bathroom and remove wood fRochester · Site work · DEMOLITION · Complete · #DEMO-26-18
Permit counts reflect permits filed in public town records naming this contractor as applicant. A permit shows permitted activity, not necessarily completed work, quality of work, or a final inspection.
License
We haven’t verified a state license for this name yet. We only show license details when we can match the record to this contractor with confidence. You can check directly at the New Hampshire Office of Professional Licensure and Certification (OPLC) license lookup.
Is this your business?
Claim this profile for free to correct details and share it. Upgrade for $9/mo to add photos, a description and an enhanced contact form. Your phone number and quote button stay free. Your permit activity is shown the same way either way.
Sources
- Portsmouth OpenGov portal · retrieved Nov 13, 2026
- Rochester OpenGov portal · retrieved Nov 13, 2026
Not verified: contact info, business address, insurance, reviews. Page built Nov 13, 2026.